ADVERTISEMENT
  • Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Friday, September 19, 2025
Leadership Newspapers
Read in Hausa
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

FG Checks Pavement Failure, Neglect Of East-West Road

by Tarkaa David
1 year ago
in News
Share on WhatsAppShare on FacebookShare on XTelegram

Federal government has introduced new measures to end pavement failures and years of infrastructural neglect on the East-West Road traversing the South-South region.

Advertisement

The minister of works, Engr Nweze David Umahi, revealed this during a visit to the project sites on the East-West Road section II: Kaiama-Ahoada in Rivers/Bayelsa states; the construction of multiple box culverts at flood damaged locations on the dualisation of the road handled by Messrs Rock Results Nigeria Ltd and the dualisation of Section II (sub section II) managed by SETRACO Nigeria Ltd dated 22nd July 2024.

In a statement by his special adviser media Orji Uchenna Orji, Umahi said the government redesigned the inherited ongoing project, using reinforced concrete technology to end the perennial pavement failures and years of road neglect across the wetland Niger Delta.

He said some sections of the East-West Road starting from Lokoja to Benin were also rescued and redesigned in reinforced concrete, adding that the height of the road was increased above the flood level.

The minister stated that the redesign factored in the peculiar environment, geomorphology and soil characteristics, which were responsible for the failures of flexible pavement used over the years by successive administrations.

Related News

Court Martial Sentences Soldier To Death For Murder

4 hours ago

2025 Budget: N’Assembly Seeks Withdrawal Of Contract Circulars

4 hours ago

In the Kaiama-Ahoada section, he said, “When we came on board, the past administration had already awarded the job. And so, the only new thing in all these locations under President Tinubu is the relief culverts that these two local contractors are putting in, proving themselves to be of a very high reputation in terms of their work.

We are encouraging many more local contractors to come and work because there’s so much to work.”

He observed that the impact of climate change was largely responsible for the flood that came over the two sections of the road but commended the two contractors handling the relief culverts for their commitment to the intervention work despite having not been paid.

He said, “And so our directive is that the contractor shouldn’t open more relief culverts. Let us contain the floods by working with NDDC. And I commend the MD of NDDC for the fantastic work they are doing.”

He thanked Rock Results, who also handled emergency works, even though it was outside the scope and the 29 Battalion with other paramilitary outfits for the management of the traffic, which he said would continue for the next two to four weeks.

 

Join Our WhatsApp Channel

Tags: David Umahi
SendShare10167Tweet6355Share

Other News Updates

News

Court Martial Sentences Soldier To Death For Murder

2025/09/18
News

2025 Budget: N’Assembly Seeks Withdrawal Of Contract Circulars

2025/09/18
News

Emergencies: ONSA Leads Simulation Exercise To Test National Response Preparedness

2025/09/18
News

Kwara Government Relocates NYSC Camp Over Insecurity

2025/09/18
News

Sports Reform At Heart Of Nigeria’s 2030 Games Bid ¬— Presidency

2025/09/18
News

Rivers Assembly To Probe Administrator Ibas

2025/09/18
Leadership Conference advertisement

LATEST

Haaland Scores Landmark Goal As City Beat 10-man Napoli In Champions League

Rashford Scores Twice As Barca Beat Newcastle In Champions League Opener

Court Martial Sentences Soldier To Death For Murder

2025 Budget: N’Assembly Seeks Withdrawal Of Contract Circulars

Fubara’s Whereabout Unknown Day After Reinstatement

Wike Defends Midnight Meeting With Fubara Over Rivers Election

Emergencies: ONSA Leads Simulation Exercise To Test National Response Preparedness

Wike Assures Of Non-interference In Fubara’s Choice Of Cabinet

Kwara Government Relocates NYSC Camp Over Insecurity

Sports Reform At Heart Of Nigeria’s 2030 Games Bid ¬— Presidency

© 2025 Leadership Media Group - All Rights Reserved.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2025 Leadership Media Group - All Rights Reserved.