• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Monday, June 2, 2025
Leadership Newspapers
Read in Hausa
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

52MW Maiduguri Power Project For Full Operation By 2025, NNPC Assures

by Leadership News
6 months ago
in Business
Maiduguri Power Project
Share on WhatsAppShare on FacebookShare on XTelegram

The Nigerian National Petroleum Company (NNPC) Limited has assured the complete operation of the 52 megawatts Maiduguri Emergency Power Project (MEPP) by 2025.

Advertisement

This was made known during an inspection visit by minister of state, Petroleum Resources (Gas) Ekperipe Ekpo, on Saturday, December 14, 2024.

NNPC’s GCEO, Mele Kyari, and the executive vice president of Gas, Power & New Energy, Olalekan Ogunleyeaccompanied the minister.

The NNPC said on its official X (formerly Twitter) account that the 32MW Simple Cycle phase of the project is already completed and operational, while the remaining 18MW Combined Cycle phase is set to be operational by 2025.

MEPP, a 52MW Integrated Power Project, was commissioned on March 2, 2023, by former President Muhammadu Buhari.

RELATED

Forum Salutes Tinubu, Umahi Over Infrastructural Development In North

Amid 2,669 Road Construction Projects, Engineers Blame Kickbacks For Failures

47 minutes ago
Large-cap Stock Drives Local Bourse To N180bn Gains

Stock Investors Gain N3.967trn In May Amidst Positive Returns

51 minutes ago

The power generation project aimed at providing reliable and sustainable electricity to the city of Maiduguri, the capital of Borno State, and its environs.

The Project was necessitated by the extended power outages experienced in the region in the last nine years, according to the NNPC.

“These outages, caused by vandalism and insurgency attacks on power supply infrastructure had resulted in a decline in economic activities in the region.”


We’ve got the edge. Get real-time reports, breaking scoops, and exclusive angles delivered straight to your phone. Don’t settle for stale news. Join LEADERSHIP NEWS on WhatsApp for 24/7 updates →

Join Our WhatsApp Channel

Breaking NEWS: Nigerians can now earn in US Dollars, acquire ultra premium domains for low and sell for super profit. Our client acquired a domain for $3715 and got it sold for $42,000. Click here to see how you too can profit from the business.


Tags: MaiduguriNigerian National Petroleum Company Limited (NNPCL)
SendShareTweetShare
Previous Post

Hospitality Businesses Groan Over Increasing Operating Cost

Next Post

Kwara Female Lawmaker Empowers 1,000 Artisans, Widows

Leadership News

Leadership News

You May Like

Forum Salutes Tinubu, Umahi Over Infrastructural Development In North
Business

Amid 2,669 Road Construction Projects, Engineers Blame Kickbacks For Failures

2025/06/02
Large-cap Stock Drives Local Bourse To N180bn Gains
Business

Stock Investors Gain N3.967trn In May Amidst Positive Returns

2025/06/02
NCAT Rector Raises The Alarm Over Shortage Of Funds For Capital Projects
Business

‘Foreign Students’ Surge At NCAT Boosts Federal Gov’t’s Forex Earnings’

2025/06/02
IWD: Female Employees Share Career Journey At Schneider Electric
Business

‘AI Key To Optimising Infrastructure Surge For Nigeria Data Centres’

2025/06/02
Analyst Hails Senate Over Passage Of Tax Reform Bills
Business

IMF, Analysts Caution Federal Gov’t Over Increasing Debt

2025/06/02
I Regret Not Buying Arsenal — Dangote
Business

Dangote Refinery Has Capacity To Meet West Africa’s Petroleum Needs – Dangote

2025/06/02
Leadership Conference advertisement

LATEST

I Won’t Take Chieftaincy Titles While In Office, Says Makinde

Archbishop Bassey Prays For Governor Otu’s Continued Success

Tinubu Performed Well, Will Do Better In Next 2 Years – Ikenga

Oborevwori Condemns Age Falsification By Civil Servants

Oba Of Benin Resolves 7–year–old Communal Crisis

Maternal Death: 100 Birth Attendants Recruited In Bauchi

Atiku, Obi, Kwankwaso Mourn Demise Of 22 Kano Athletes

Opposition’s Gang Up Can’t Stop Tinubu – Kogi Ex-Speaker

National Convention: Elect Officers Based On Merit, Professionals Warn PDP

Pro-Tinubu Group Adopts Wike Chief As Patron

© 2025 Leadership Media Group - All Rights Reserved.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2025 Leadership Media Group - All Rights Reserved.