• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Monday, June 15, 2026
Leadership Newspapers
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
Hausa Edition
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

NEMSA Allays Fears Over Prepaid Meters Upgrade Process

Jerry Emmason by Jerry Emmason
3 years ago
in Business
meter
Share on WhatsAppShare on FacebookShare on XTelegram

The Nigerian Electricity Management Services Agency (NEMSA) has assured the public of NEMSA’s readiness to ensure that all electricity meters and instruments deployed in the Nigerian Electricity Supply Industry (NESI) are of the right standard, specification, safety and quality to accurately measure and record electrical energy consumed and guarantee safety of lives and property.

NEMSA managing director/CEO & chief Electrical Inspector of the Federation, Engr. Aliyu Tukur Tahir,  gave the assurance at the weekend  while reacting to public enquiries especially from  electricity  consumers over the ongoing discussion on the  issue of Standard Transfer Specification (STS) prepaid meters upgrading by means of Token Identifier (TID) rollover set to commence soon by the Distribution Companies in Nigeria.

While noting their concerns, the NEMSA chief executive advised electricity consumers not to fear, stressing that the Token Identifier is a 24-bit field, contained in STS compliant tokens, that identifies the date and time of the token generation which he said  is used to determine if a token has already been used in a prepaid meter.

“The TID represents the number of minutes elapsed since the base date of 1st January 1993. The incrementing of the 24-bit field means that at some point in time, the TID value will roll over to a zero value”, he said in a statement yesterday.

According to him, in order to overcome the TID rollover occurrence, all meters will require key change tokens with the roll over bit set which will be provided by the Utility Companies when the key change tokens are imputed, that process will force the meters to reset the TID stack memory to 0 and change the meter key at the same time.

“ This process will not make energy meters faster or slower, hence, there is no need for panic and that the TID rollover will NOT alter or change the metrological properties of electricity meters that have been certified by NEMSA, to accurately measure and record electrical energy consumed.

RELATED NEWS

Infrastructure Debt Fund Grows As NGX Admits 303,059 New Units To Official List

Universal Insurance Extends N3.2bn Rights Issue Trading Period

Govt May Need to Hike VAT, Introduce Telecom Tax – IMF

“ Meter manufacturers will be required to change their production processes in order to cater for the new manufacturing hardware secure modules and key load files.

“They are also required to start manufacturing meters on the 2014 base date as will be specified by their customers when they have updated their vending systems.

“Also, the Distribution Companies (DISCOs) will provide their prepaid meter customers Key Change Tokens (KCT) alongside their regular energy tokens when purchasing electricity”, he said.

Engr. Aliyu Tahir further stated that  the prepaid meter end-users will be involved in the final piece of the puzzle – the TID rollover key change process. This process he said involves a special pair of tokens called a key change token (KCT) that would be entered into the prepaid meter to finalise the update of the prepaid meter software.

“Customers must upgrade their prepaid meters by sequentially entering the two KCT tokens (KCT1 & KCT2) and then the energy token, as to be provided by the DISCO. Customers must ensure that any unused or previously purchased energy tokens are loaded into their meters before the expiry date.

“Let me assure all electricity customers that they have nothing to fear as the meter upgrade process will not affect the credit unit balance on their meters. The credit balance will remain intact after the upgrade. They are also to note that meter upgrade is a one-time process. Subsequent energy token purchases will continue as usual after the upgrade has been completed”, Engr Tahir said.

 

We’ve got the edge. Get real-time reports, breaking scoops, and exclusive angles delivered straight to your phone. Don’t settle for stale news. Join LEADERSHIP NEWS on WhatsApp for 24/7 updates →

Join Our WhatsApp Channel

Nigerians can invest ₦2.5million on premium domains and earn about ₦17-25Million. Earnings in USD. Rather than wonder, click here to find out how it works
Jerry Emmason

Jerry Emmason

OTHER NEWS UPDATES

NGX Records First Commercial Paper Listing With Dangote Cement’s N119.87bn Deal
Business

Infrastructure Debt Fund Grows As NGX Admits 303,059 New Units To Official List

6 hours ago
Universal Insurance Extends N3.2bn Rights Issue Trading Period
Business

Universal Insurance Extends N3.2bn Rights Issue Trading Period

6 hours ago
IMF Projects Nigeria To Become Africa’s Third Largest Economy By 2026
Business

Govt May Need to Hike VAT, Introduce Telecom Tax – IMF

6 hours ago
Next Post
Nigeria-Japan Annual Trade Value Hits $10bn

Nigeria-Japan Annual Trade Value Hits $10bn

Advertisement

LATEST UPDATE

‘We Didn’t Know How Our Father’s Corpse Was Released For Burial By Bandits’ – Late Gen. Abubakar’s Son

5 hours ago

Tinubu Celebrates SEDC CEO Mark Okoye At 40

5 hours ago

Ocheme Targets Global Stardom After Stunning Flying-Knee Knockout At PFL Africa

5 hours ago

Philip Shaibu Congratulates Edo Queens On NWFL Triumph, Continental Qualification

5 hours ago

Infrastructure Debt Fund Grows As NGX Admits 303,059 New Units To Official List

6 hours ago
Load More
Advertisement
Facebook Twitter Instagram Youtube Whatsapp

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino.