• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Wednesday, August 13, 2025
Leadership Newspapers
Read in Hausa
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

‘CBN’s N122.223bn Power Intervention Projects Ready Next May’

by Kayode Ekundayo
2 years ago
in Business
CBN
Share on WhatsAppShare on FacebookShare on XTelegram

The much anticipated Central Bank of Nigeria (CBN)’s power intervention projects will be ready by May, 2024, according to Project Management Office, Transmission Company of Nigeria (TCN), Engr. Engineer Matthew Ajibade, 

Advertisement

The N122.223 billion projects, which cut across the states of the federation, aim to resolve the transmission and distribution interface bottlenecks to improve supply to end users and unlock the unutilised generation capacity in the country.

Ajibade, who led the CBN, Nigeria Electricity Regulatory Commission (NERC), NESI and other stakeholders on tour of the projects sites in Lagos on Wednesday, noted that, manufacturing process for most of the contacts is scheduled to be completed early next year 2024 to pave way for shipment and delivery.

The projects, when completed, will enhance delivery of about 1,500MW of power nationwide.

Recall that the Central Bank of Nigeria (CBN) had, in August this year, approved the sum of N122,289,344,369.39 for intervention in the nation’s power sector.The loans were accessed by the 11 electricity distribution companies at 9 % interest rate from the Central Bank of Nigeria(CBN).

RELATED

FUEL CRISIS…Hold Marketers Responsible For Long Queues – Dangote

JUST-IN: Dangote Refinery Reduces Petrol Price To N820 Per Litre

6 hours ago
Heirs Energies To Share Africa’s Success Story At Namibia Oil & Gas Conference

Heirs Energies To Share Africa’s Success Story At Namibia Oil & Gas Conference

6 hours ago

According to Ajibade, so far, N85.4billion of the approved sum had been disbursed to 53 contractors to execute the projects.

Already, 10 of the power transformers have been delivered while the rest ranging from 150MVA, 100MVA and 60MVA are expected to be delivered and installed on or before May 2024.

“This intervention is anchored on firm Service Level Agreements (SLAs) between TCN and DisCos on the one hand and DisCos and their customers on the other hand. The facility was given to Discos to invest in TCN Networks by virtue of NERC regulation that permits third party investment in the Electricity Network. 

Payment for the loan would be a net off from the TCN monthly invoice to DisCos. The project implementation Office (PMO) is resident in TCN for effective implementation”, he stated. 

However, seven contractors that have finished with offshore production process are; Skipper Nigeria Ltd (BEDC), GTA Engineering Nigeria Limited for PHEDC network, T&D West Africa Ltd (IKEDC), Lagacee Power Ltd (AEDC), Bussdor & Company Ltd (AEDC) FOSAB Global Energy Services Limited PHEDC and Beam Energy Ltd (EKEDP). 

Some consignments containing Power Transformers have been delivered to Gwagwalada, Oworonsoki 132/33KV Substation and TCN Ojo store in Lagos by Contractors.

CBN’s representative and Assistant Director/ Head Infrastructure Finance Office, Tumba Abdulrazaq Tijani, applauded the commitments of the contractors, saying, execution of the projects within a short time of accessing funds surpassed the bank’s expectations.

He noted that the projects, when completed, will impact positively on electricity deliveries by discos to consumers across the country.

The projects include eight 150MVA, 19 of 100MVA, 67 of 60MVA, three Re-conductoring existing Transmission lines (Conductors & Accessories) of 517.5 km, 24 contracts for upgrading Existing 132/33KV Substations and construction of 50 of 33KV line bays.


We’ve got the edge. Get real-time reports, breaking scoops, and exclusive angles delivered straight to your phone. Don’t settle for stale news. Join LEADERSHIP NEWS on WhatsApp for 24/7 updates →

Join Our WhatsApp Channel




Tags: CBN
SendShareTweetShare
Previous Post

Lack Of Synergy Hindering Mutual Development, Tinubu Tells Visiting Benin President

Next Post

Group Tasks Women On Diligence, Self-care

Kayode Ekundayo

Kayode Ekundayo

You May Like

FUEL CRISIS…Hold Marketers Responsible For Long Queues – Dangote
Business

JUST-IN: Dangote Refinery Reduces Petrol Price To N820 Per Litre

2025/08/12
Heirs Energies To Share Africa’s Success Story At Namibia Oil & Gas Conference
Business

Heirs Energies To Share Africa’s Success Story At Namibia Oil & Gas Conference

2025/08/12
Key Industry Experts To Discuss Opportunities At Gas Investment Forum
Business

Key Industry Experts To Discuss Opportunities At Gas Investment Forum

2025/08/12
Refinery Revival: More Than Just Another Promise?
Business

Marketers Blame NNPC For Delay As Port Harcourt Refinery Shutdown Drags

2025/08/12
Export: Nigeria To Build 6 Additional Plants For Cashew Production
Business

Non-oil Exports Rise By 19.6% In H1 – NEPC

2025/08/12
Federal Gov’t, IFAD Train 600 Farmers In Budgeting, Farming Techniques In Benue
Business

Farmers Advocate Quick Implementation Of Post-harvest Policy

2025/08/12
Leadership Conference advertisement

LATEST

NLC Seeks Sale Of Crude Oil To Dangote Refinery In Naira

VP Shettima Commissions 2 Bombardier Jets For Cross River’s Cally Air

Oyo Gov’t Distributes Tablets, Teaching Aids To 18,000 Teachers

Senate To Investigate Rising Flight Crew–Passenger Clashes

JUST-IN: IGP Orders Probe Of Abuja Airport Incident Involving KWAM 1

Tambuwal: Netizens Challenge EFCC On Okowa, Ganduje, Yahaya Bello

Donnarumma Bids Farewell To PSG

CHAN 2024: Nigeria Crashes Out, Loses 4-0 To Sudan

JUST-IN: Dangote Refinery Reduces Petrol Price To N820 Per Litre

Heirs Energies To Share Africa’s Success Story At Namibia Oil & Gas Conference

© 2025 Leadership Media Group - All Rights Reserved.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2025 Leadership Media Group - All Rights Reserved.