• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Saturday, June 13, 2026
Leadership Newspapers
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
Hausa Edition
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

Vandals’ Attack Cuts AEDC’s Power Supply By 250MW– TCN

Nse Anthony-Uko by Nse Anthony-Uko
2 years ago
in Business
download 1 1
Share on WhatsAppShare on FacebookShare on XTelegram

Major parts of Abuja, Nigeria’s federal capital city, have been plunged into darkness, as attacks on tower 70 along the 330kV Gwagwalada-Katampe Transmission line, reduced bulk power supply flexibility and the volume of power into the city by 250MW.

The Transmission Company of Nigeria, (TCN), the agency managing the facility, said the incident occurred on Monday, 26th of February, 2024, at about 11.32 pm.

TCN general manager, Public Affairs, Ndidi Mbah, in a statement issued in Abuja on Wednesday.

She said the transmission line was completely vandalised with the “tower standing precariously on the ground.”

Mbah, however, reassured that engineers have been mobilised to the site of the incident and that they have commenced an emergency repair of the damaged tower and its associated equipment.

RELATED NEWS

UK Announces New £15m Growth Programme To Unlock Investment In Nigeria

World Bank Cuts Nigeria’s 2026 Growth Forecast to 4.1% Despite Crude Rally

Firm Calls For Cross-sector Collaboration To Harness AI Against Counterfeiting

The statement reads, “The Transmission Company of Nigeria (TCN) hereby states that Tower 70 along its 330kV Gwagwalada-Katampe Transmission line has been vandalised with the tower standing precariously on the ground.

“At the said time, the Gwagwalada – Katampe Transmission line tripped at Gwagwalada Transmission Substation and trial reclosure by TCN Operators failed, necessitating a physical patrol of the line.

“The TCN lines and patrol team discovered that the four tower footings of Tower 70 were vandalised, destroying the tower legs and causing the tower to stand on the ground, supported by conductors.

“The incident has reduced bulk power supply flexibility and the volume of power into Abuja by 250MW.

“Meanwhile, TCN has mobilised to the site of the incident and has commenced an emergency repair of the damaged tower and its associated equipment.

“We reiterate the need for vigilance in the fight against vandalism of power equipment. It is important that we report suspicious movements around all power equipment to security operatives or to the nearest TCN offices nationwide, “ she said.

We’ve got the edge. Get real-time reports, breaking scoops, and exclusive angles delivered straight to your phone. Don’t settle for stale news. Join LEADERSHIP NEWS on WhatsApp for 24/7 updates →

Join Our WhatsApp Channel

Nigerians can invest ₦2.5million on premium domains and earn about ₦17-25Million. Earnings in USD. Rather than wonder, click here to find out how it works
Nse Anthony-Uko

Nse Anthony-Uko

Nse Anthony-Uko is a business and financial journalist with over two decades of experience covering Nigeria's financial system, economy, energy sector, corporate landscape, and global economic developments. Her expertise blends frontline journalism with editorial leadership and a strong grasp of financial market dynamics. She has earned multiple professional recognitions and was selected for the International Visitors Leadership Programme (IVLP) in the United States.

OTHER NEWS UPDATES

UK Announces New £15m Growth Programme To Unlock Investment In Nigeria
Business

UK Announces New £15m Growth Programme To Unlock Investment In Nigeria

1 hour ago
Did World Bank Misread Development?
Business

World Bank Cuts Nigeria’s 2026 Growth Forecast to 4.1% Despite Crude Rally

2 hours ago
Guinness Nigeria Commits To Local Sourcing, Revenue Growth
Business

Firm Calls For Cross-sector Collaboration To Harness AI Against Counterfeiting

2 hours ago
Next Post
NIWA Orders Suspension Of Land Reclamation In Banana Island

Mishap: Only 25% Of Passengers Boats On Lagos Water Seaworthy – NIWA

Advertisement

LATEST UPDATE

June 12 Special: Nigerians Reflect On Democracy Since 1999, Demand Better Governance

39 minutes ago

June 12 Legacy Must Inspire Youths Through Electoral Integrity, Says Adebayo

40 minutes ago

Agency Dismantles Syndicates Recruiting Women Into Drug Trade

42 minutes ago

Police Launch Crackdown On Unauthorised Number Plates

44 minutes ago

Police Probe Death Of Kebbi Varsity Student

47 minutes ago
Load More
Advertisement
Facebook Twitter Instagram Youtube Whatsapp

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino.