• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Sunday, July 13, 2025
Leadership Newspapers
Read in Hausa
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

FG To Patronise Local Contractors In Road Projects

by Felix Igbekoyi
1 year ago
in Cover Stories
Share on WhatsAppShare on FacebookShare on XTelegram

Minister of Works, Senator Dave Umahi, has said the federal government would terminate contracts of non-performing companies whether indigenous or expatriate.
He however promised that the federal government will give more opportunities to indigenous contractors in the construction and rehabilitation of federal roads.

Advertisement

He spoke at the weekend during the inspection of rehabilitation works on federal roads at Sapele-Ologbo-Benin Road and the East-West roads in Delta State.
While commending the contractor, Trutech Global Investment Services Limited, handling the four failed sections of the East-West Road between Uhweru and Patani, he expressed displeasure with the progress of work at Sapele-Ologbo-Benin road by the contractor, Geld Construction Ltd.

He, however, threatened to terminate the contract of the Sapele-Benin Road as he said that it would relieve the people of the difficulties, they face daily in plying the roads.
The minister ordered the ministry’s supervising engineers to issue a warning letter to the contractor on Monday, and after 14 days should it fail to do the needful, he would personally terminate the contract.

“Most contractors in Nigeria are playing politics, which l will not tolerate. After one week, if the contractor does not commence the construction of continuous reinforced concrete pavement, the contract will be terminated.”
Umahi lamented the suffering of road users and faulted the contractor for attributing the slow pace of work on-site to the high cost of cement.

“We paid multi-billion naira for this job. We will never pay Variation On Price (VOP) for the amount of money that we have paid. That is the problem with Levant Construction Company.
“You cannot do this kind of job in your country; it can only happen in Africa. You cannot collect our money and be misbehaving. It is a big shame. Look at how people are suffering everywhere, and we should be happy clapping for you.

RELATED

Flood Warnings: We’re Ready For Downpour, States Declare

Flood Warnings: We’re Ready For Downpour, States Declare

26 minutes ago
Polio: UNICEF, Radio Kano Launch ‘No More Zero Dose’ Campaign

UNICEF Raises The Alarm, Says 32% Of Nigerian Under-5 Children Malnourished

27 minutes ago

“I have had more than ten meetings with them on this job. If anything goes wrong, they will be calling the President,” he said.
At the Amukpe roundabout end of the ongoing dualisation of the Sapele-Eku-Agbor Road, he directed the contracting firm, CGC Nigeria Limited to discontinue for now the dualisation until it finishes one carriageway of the project as well as rescope the job.

He told the contractor that “the existing carriageway should be worked upon. Do not continue with the dualisation until we have finished one carriageway. There is no need to continue the two carriageways when we don’t have money to even finish one.

“I am directing that you (CGC Nigeria Limited) to rescope the job. We are not stopping the dualisation but we are phasing it. We finish the existing lane, make it motorable for people and then we go into the other one,” the minister ordered.

Engineer Adesola Adetoro of Trutech Global Investment Services Ltd however assured the minister of full compliance with the project specifications while working to ensure early completion.
The dualisation project of the Sapele-Eku-Agbor Road with section one starting in Sapele was awarded in 2014 but work commenced in 2015. The project is 110.6 kilometres with a percentage completion presently at 12.9 percent.


We’ve got the edge. Get real-time reports, breaking scoops, and exclusive angles delivered straight to your phone. Don’t settle for stale news. Join LEADERSHIP NEWS on WhatsApp for 24/7 updates →

Join Our WhatsApp Channel



Tags: Dave Umahi
SendShareTweetShare
Previous Post

Sultan Declares Today First Day Of Ramadan

Next Post

ALLEGED N3TRN BUDGET PADDING…Public Records Contradict Northern Senators

Felix Igbekoyi

Felix Igbekoyi

You May Like

Flood Warnings: We’re Ready For Downpour, States Declare
Cover Stories

Flood Warnings: We’re Ready For Downpour, States Declare

2025/07/13
Polio: UNICEF, Radio Kano Launch ‘No More Zero Dose’ Campaign
Cover Stories

UNICEF Raises The Alarm, Says 32% Of Nigerian Under-5 Children Malnourished

2025/07/13
Champions Among Giants: Nigerian Stars Who Conquered 2024/25 Football Season
Cover Stories

Champions Among Giants: Nigerian Stars Who Conquered 2024/25 Football Season

2025/07/13
FG Spends N4.3m Daily To Feed 3,823 Inmates On Death Row
Cover Stories

FG Spends N4.3m Daily To Feed 3,823 Inmates On Death Row

2025/07/12
Mechanical Engineer From Kwara — All You Need To Know About New NNPCL Boss Bashir Ojulari
Cover Stories

Sale Of State-owned Refineries Not Ruled Out–NNPC GMD

2025/07/12
Against All Odds: 10-Year-Old Survives 10 Surgery  After Abandonment
Cover Stories

Against All Odds: 10-Year-Old Survives 10 Surgery After Abandonment

2025/07/12
Leadership Conference advertisement

LATEST

Reps Threaten Polytechnic Rectors For Shunning Meetings

Etsu Nupe Seeks Role For Traditional Rulers, As Okura, Edu, Others Demand New State

US Resumes Military Supplies To Ukraine

Constitution Review: It’s Time For State Police, Fiscal Federalism, Says Kaduna Gov

Fuel Switches Cut Off Before Air India Crash – Report

Experts Decry Delay In Envoys’ Appointments

Constitution Review: Gov Yahaya Urges Inclusive, Functional Framework

Youth Minister Partners GITEX Global, Deepens UAE Collaboration to Empower Young Nigerians

Kano Residents Hold Special Prayers For Rain

Coming From America

© 2025 Leadership Media Group - All Rights Reserved.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2025 Leadership Media Group - All Rights Reserved.