• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Friday, November 13, 2026
Leadership Newspapers
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
Hausa Edition
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

Bauchi Gov Delivers Road Projects In Bogoro, Expands Infrastructure Drive

Jerry Emmason by Jerry Emmason
1 year ago
in News
Bala Mohammed Bauchi
Share on WhatsAppShare on FacebookShare on XTelegram

Bogoro local government area of Bauchi State has commended the state governor, Senator Bala Abdulkadir Mohammed for the successful completion of two major road projects in the area as part of his administration’s drive to transform the rural communities.

The completed road projects are the 11.2-km Boi-Tapshin and the 11-km Malar-Lusa-Bogoro, while the Bogoro people generally commended the governor for the financial tap-up to the successful completion of the township Interdenominational Church.

The project supervising engineer, Ado Shehu in Bogoro told the state facility tour team led by the commissioner for Information and Communication, Usman Shehu Usman, that contract for the two roads which were awarded in 2020 have successfully been completed and delivered within the time framework.

The Boi-Tapshin road was also completed on schedule and has been opened for public use, while the Tapshin Bridge was elevated to withstand heavy water flow during the rainy season, a development that has eased flooding challenges in the area.

He said the road, which was awarded under the state’s Accelerated Road Project initiative, was completed with modern specifications, including a five-span bridge, box and ring culverts, and a 10.3-metre-wide carriageway with shoulders.

Residents, including Istifanus Barde from Tapshin and Astra John from Boi, recalled the difficulties they endured before the road was constructed, particularly during floods when trade and farming activities were disrupted.

The team also visited the ongoing Boi–Gambar–Lere Road, initially awarded in 2024 at 29 kilometers but later extended to over 35 kilometers following realignment.

According to him, the contract duration is 36 dry months, with current progress at about 48 per cent. He noted that three major bridges have been completed, two more are under construction, while over 40 culverts have already been installed.

Shehu further disclosed that the project scope was expanded to include a two-span bridge at Zakam, following community requests, which Governor Bala Mohammed approved and funded.

RELATED NEWS

2027: ADC-PCC Demands Withdrawal Of Tinubu’s ‘All Is Fair In Politics’ Remark

Oriire Abduction: Presidency Fires Back At Makinde, Says Tinubu Acted Swiftly

How Police Rescued 3-Year- Old Girl After 2 Weeks In Captivity

Local leaders similarly expressed appreciation for the governor’s interventions, while Hon. Paulmi Bulus Datsir, Councillor of Gambar Ward, said the new roads have significantly improved the movement of people and farm produce.

Datsir who said that the roads are now boosting economic activities of the area, however, appealed for the timely completion of the Boi-Gambar-Lere Road to address challenges posed by the rainy season.

Community members and traditional leaders in Bogoro described the road projects as a turning point, saying the improved road networks are opening up their communities for trade, farming, and social interactions.

At the Bogoro Local Government Secretariat, the inspection team was received by the chairman Hon. Lawi Yakubu Tsumi.

Hon. Lawi Yakubu Sumi reaffirmed that the Bala Mohammed administration remained committed to completing all ongoing projects across the state within stipulated timelines.

Addressing the gathering, Hon. Usman Shehu Usman explained that the visit was part of efforts to assess key road projects in the area.

We’ve got the edge. Get real-time reports, breaking scoops, and exclusive angles delivered straight to your phone. Don’t settle for stale news. Join LEADERSHIP NEWS on WhatsApp for 24/7 updates →

Join Our WhatsApp Channel

BREAKING NEWS: Nigerians can invest ₦2.5million on premium domains and earn about ₦17-25Million. Earnings in USD. Rather than wonder, click here to find out how it works

Jerry Emmason

Jerry Emmason

OTHER NEWS UPDATES

ADC Gives Sokoto 24 Hours To Fish Out Attackers Of Governorship Candidate
News

2027: ADC-PCC Demands Withdrawal Of Tinubu’s ‘All Is Fair In Politics’ Remark

46 seconds ago
News

Oriire Abduction: Presidency Fires Back At Makinde, Says Tinubu Acted Swiftly

2 minutes ago
How Police Rescued 3-Year- Old Girl After 2 Weeks In Captivity
North West

How Police Rescued 3-Year- Old Girl After 2 Weeks In Captivity

8 minutes ago
Next Post
Yaroe Releases Fertiliser To Constituents

Yaroe Releases Fertiliser To Constituents

LATEST UPDATE

2027: ADC-PCC Demands Withdrawal Of Tinubu’s ‘All Is Fair In Politics’ Remark

46 seconds ago

Oriire Abduction: Presidency Fires Back At Makinde, Says Tinubu Acted Swiftly

2 minutes ago

How Police Rescued 3-Year- Old Girl After 2 Weeks In Captivity

8 minutes ago

‘Issakaba’ Returns To Cinemas 25 Years After Original Film

21 minutes ago

Police Arrest Suspected Terrorism Financiers, Bandits’ Motorcycle Suppliers, Recover 5 Pistols

25 minutes ago

Oyo Police Arraign 2 Over False Publications, Defamation, Video Of Late Singer Toluwanisings

51 minutes ago

Tinubu’s Aide Calls Obi, Kwankwaso ‘Entertainers’, Says APC Not Afraid of Opposition

1 hour ago

BREAKING: 12 Diphtheria Cases Confirmed At Kano Girls’ College

1 hour ago

Umahi Orders Emergency Rehabilitation Of Major Federal Highways For 2027 Elections

2 hours ago

EFCC Recovered Pipeline Fees Owed To Nembe–NNPCL JV, Not From Nembe, Firm Clarifies

2 hours ago
Load More
Facebook Twitter Instagram Youtube Whatsapp

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino | Polskie Kasyno.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino | Polskie Kasyno.