• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Monday, August 4, 2025
Leadership Newspapers
Read in Hausa
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

Buhari Launches Kashimbila Multipurpose Dam

740mw Zungeru, Dadinkowa hydropower plants ready for commissioning

by Jonathan Nda-Isaiah
2 years ago
in News
Share on WhatsAppShare on FacebookShare on XTelegram

 

Advertisement

President Muhammadu Buhari, on Thursday, inaugurated the Kashimbila Multipurpose Dam, 40MW Hydropower Station and Associated 132KV Switchyard, Transmission Line and Distribution Substation (Phase I) Project, located at the Kashimbila Dam site in Taraba State.

Speaking at a virtual ceremony held at the Council Chamber, State House, Abuja, the President, in a statement by Presidential Spokesman, Femi Adesina, underscored the importance of the project, highlighting its role in his administration’s commitment to achieving the target of 30GW of electricity in the country by 2030, under the Electricity Vision 30:30:30.

President Buhari, while inviting the Minister of the Federal Capital Territory (FCT), Mohammed Bello, to unveil the project on his behalf, noted that the Electricity Vision initiative aimed to have renewable energy contribute at least 30% to the nation’s energy mix, thereby expediting the expansion of electricity access.

Furthermore, the President said the implementation and completion of the Kashimbila projects aligned with his government’s policies to alleviate poverty, generate employment opportunities, enhance healthcare services, and improve the overall standard of living of Nigerians.

RELATED

NCC, Civil Defence Corps Align To Tackle Telecoms Crimes

NCC Set To Introduce Stiffer Sanctions Against Errant ICT Operators

36 minutes ago
Nigeria’s Textile Import Bill Rises By 100.3% To N365.5bn

Stakeholders Advise Federal Gov’t On How To Revive Textile Sector

38 minutes ago

‘‘The Kashimbila Multipurpose Dam in Taraba State, with storage capacity of 500million cubic metres, was conceived principally to checkmate the threat of the imminent collapse of the structurally weak and poisonous Lake Nyos, located at the line of volcanic activities in Cameroun Republic, which collapse could result in flooding and affecting millions of lives and properties.

‘‘Even though the Dam was meant to serve as a buffer to contain possible discharge of water of Lake Nyos, the engineering design maximized the benefits of the Kashimbila ecosystem by incorporating a 40MW Hydropower Station, 60,000 cubic metre per day Water Supply Scheme, 2,000 hectares of Irrigation System, an airstrip, fishing activities and tourism potentials,’’ he said.

According to the President, the Phase I of the Power Evacuation Component of the Project includes the 132KV Switchyard, four substations at Takum, Wukari, Rafin Kada, Donga, and the rehabilitation of the existing 132KV Yandev substation.

It also involves the installation of a 245km, 132KV Double Circuits line from Kashimbila to Takum, Wukari, Yandev, as well as a 45km, 33kv Double Circuits line from Wukari to Donga through Rafin Kada, he added.

‘‘I understand that the Water Supply component that is intended to service Takum and environs has reached about 65% progress, while the engineering design for the 2000 Hectare Irrigation Scheme has been fully completed, and physical works will commence in due course,’’ he said.

The President assured Nigerians that other projects aimed at boosting electricity supply, such as the 40MW Dadinkowa Hydropower Plant in Gombe State and the 700MW Zungeru Hydropower Plant in Niger State, are also ready for commissioning.

He commended the Federal Ministry of Water Resources and the Federal Ministry of Power for their efforts in delivering the Kashimbila Project, expressing his anticipation for increased collaboration among various Ministries, Departments, and Agencies in infrastructure development.

The President also praised the host communities and the individuals affected by the Kashimbila Multipurpose Dam Project for their cooperation, understanding, and support during the implementation of this significant undertaking.


We’ve got the edge. Get real-time reports, breaking scoops, and exclusive angles delivered straight to your phone. Don’t settle for stale news. Join LEADERSHIP NEWS on WhatsApp for 24/7 updates →

Join Our WhatsApp Channel




SendShareTweetShare
Previous Post

2 Suspects Arrested Over Attack On US Embassy Staff In Anambra

Next Post

Zamfara Gov Under Investigation For Alleged N70bn Fraud – EFCC

Jonathan Nda-Isaiah

Jonathan Nda-Isaiah

You May Like

NCC, Civil Defence Corps Align To Tackle Telecoms Crimes
Business

NCC Set To Introduce Stiffer Sanctions Against Errant ICT Operators

2025/08/04
Nigeria’s Textile Import Bill Rises By 100.3% To N365.5bn
Business

Stakeholders Advise Federal Gov’t On How To Revive Textile Sector

2025/08/04
Oduwole’s Reappointment As Presidential Aide Excites Investors
Business

Nigeria, Benin Republic Agree On Trade Framework

2025/08/04
Ex-CITN President Seeks Tax Policy Overhaul to Fight Poverty and Inequality
Business

Ex-CITN President Seeks Tax Policy Overhaul to Fight Poverty and Inequality

2025/08/04
Power Generation Rose By 30% In 2024 – Adelabu
Business

Electricity Distribution: Loss Levels Exceed Regulatory Limits, Adelabu Laments

2025/08/04
Baro Port: Nigeria’s Wasted Potential
Business

Multibillion-naira Baro Port Contract Predated Oyetola – Spokesman

2025/08/04
Leadership Conference advertisement

LATEST

NCC Set To Introduce Stiffer Sanctions Against Errant ICT Operators

Stakeholders Advise Federal Gov’t On How To Revive Textile Sector

Nigeria, Benin Republic Agree On Trade Framework

Ex-CITN President Seeks Tax Policy Overhaul to Fight Poverty and Inequality

Electricity Distribution: Loss Levels Exceed Regulatory Limits, Adelabu Laments

Multibillion-naira Baro Port Contract Predated Oyetola – Spokesman

Ekiti Assembly Caucus Hails Cavista Holdings’ Agriculture, Tourism Investments

Agency Intensifies Tree Planting To Fight Desertification In Yobe

West Africa Emerging As Global Hotspot For Virtual Asset Adoption – SEC

Stop Purchasing Stolen Rail Equipment, NRC MD Warns Metal Companies

© 2025 Leadership Media Group - All Rights Reserved.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2025 Leadership Media Group - All Rights Reserved.