ADVERTISEMENT
  • Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Saturday, September 20, 2025
Leadership Newspapers
Read in Hausa
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

Federal Gov’t Begins Structural Intervention On Carter Bridge

by Leadership News
3 months ago
in News
Structural Intervention On Carter Bridge
Share on WhatsAppShare on FacebookShare on XTelegram

The Federal Ministry of Works has commenced urgent structural interventions on the Carter Bridge in Lagos following alarming signs of deterioration.

Advertisement

Julius Berger, contracted in 2024, is currently working on repairing the substructure above the water, including pile caps and handrails.

Underwater inspections had revealed severe damage beneath the bridge, suggesting that it has reached the end of its service life.

In its response, Julius Berger proposed extensive repairs or complete replacement with a new bridge.

The company recommended building a new bridge, noting that it would offer a 100-year design life and cost almost the same as major repairs.

Related News

Ogun Now Has N16trn Economy – Abiodun

53 seconds ago

Benue LG Probes School Blast

1 minute ago

Addressing concerns, the minister of Works, Engr David Umahi said re-scoping of the bridge would address rusted reinforcement due to saltwater intrusion and would also take proper study of the level of damage and deterioration of the bridge piles and pier caps which he said had overtime weakened the structural elements of the bridge.

He stated that the initial plan was to rehabilitate the bridge completely after several efforts made to restore the structural elements of the bridge.

Umahi hinted that the Carter Bridge which was built over 50 years ago had deteriorated in lifespan with all the piles and pier caps worn-out completely due to dredging activities and intrusion of high-water levels on the underdeck infrastructure, affirming that the reconstruction and re-scoping of the bridge would address deterioration and ensure the bridge’s long-term functionality.

 

 

Join Our WhatsApp Channel

Tags: Carter BridgeDavid Umahi
SendShare10171Tweet6357Share

Other News Updates

News

Ogun Now Has N16trn Economy – Abiodun

2025/09/20
News

Benue LG Probes School Blast

2025/09/20
News

Troops Nab Terrorist Kingpin In Taraba

2025/09/20
News

NCDC Dispels Ebola, Marburg Fears In Abuja

2025/09/20
News

Catholic Bishops Warn Against Flawed Elections, Bad Governance

2025/09/20
News

Drone Strike Kills 78 In Sudan Mosque

2025/09/20
Leadership Conference advertisement

LATEST

Ogun Now Has N16trn Economy – Abiodun

Benue LG Probes School Blast

Troops Nab Terrorist Kingpin In Taraba

NCDC Dispels Ebola, Marburg Fears In Abuja

Catholic Bishops Warn Against Flawed Elections, Bad Governance

Drone Strike Kills 78 In Sudan Mosque

Tinubu Felicitates Music Icon 2Baba At 50

Gaza: Taking Vengeance Too Far

Couple Freed By Taliban Hug Daughter In Emotional Reunion

Fake Pharmacist Harms Teen Girl Through Injection

© 2025 Leadership Media Group - All Rights Reserved.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2025 Leadership Media Group - All Rights Reserved.