• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Wednesday, September 9, 2026
Leadership Newspapers
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
Hausa Edition
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

Grid Output Tied to DisCos’ Demand, GenCos’ Supply, Says TCN

Nse Anthony-Uko by Nse Anthony-Uko
5 months ago
in Business
Electricity 1 1
Share on WhatsAppShare on FacebookShare on XTelegram

The Transmission Company of Nigeria (TCN) has clarified that daily power output on the national grid depends on request from electricity Distribution Companies (DisCos), generation declarations from GenCos, and TCN’s wheeling capacity— with penalties for any party failing to meet their commitments

TCN’s general manager of Public Affairs, Ndidi Mbah, stated this in a rejoinder responding to an April 2, 2026, social media post by the Port Harcourt Electricity Distribution Company (PHEDC). The post claimed TCN’s transmission capacity was 7,300MW, with operations limited to 4,000-5,000MW—figures TCN called “intentionally inaccurate” and outdated.

Her words: “First, it’s important to note that the daily output on the national grid is a function of what the DisCos nominate, what the GenCos declare they can generate, and what TCN declares it can wheel.

“There is a penalty against any of these three players if they fail to meet what they declared.”

“Do the DisCos nominate beyond 4,000-5,000MW?” Mbah asked, urging DisCos to verify claims before public posts that could mislead stakeholders.

Mbah explained that the Nigerian Independent System Operator (NISO) balances daily declarations from all players ahead of time. TCN’s verified wheeling capacity now stands at 8,700MW, up from a simulated 7,300MW due to investments in transformers, substations, and transmission lines.

“Every day–ahead, the Nigerian Independent System Operator (NISO) looks at what each player declares and tries to strike a balance, which is what is then generated, transmitted, and distributed.”

RELATED NEWS

Keyamo Woos Global OEMs For Nigeria’s Aviation Infrastructure Upgrade

NCAA, NAICOM Seal Aviation Insurance Pact

Firm Introduces Ethical Finance To Deepen Financial Inclusion

“With ongoing projects, a new simulation would show even higher capacity,” she added.
To counter the operational limit claim, TCN cited Q1 2025 peaks it successfully transmitted:

March 4, 2025: 5,801.84MW peak at 49.69Hz, with 128,370.75MWh daily energy—Nigeria’s record high.
March 2, 2025: 5,713.60MW peak, 125,542.06MWh daily.
February 14, 2025: 5,543.20MW peak, 125,159.48MWh daily.
These milestones, publicly verifiable, she said demonstrated TCN’s ability to wheel beyond 5,000MW.

Continuing, Mbah said “The fact is that 8,700MW is the simulated capacity by the Independent System Operator (ISO) when it was still part of TCN. Through sustained, capital-intensive infrastructure investments, including transformer installations, substation construction, and transmission line reconductoring, among others, TCN has progressively expanded its wheeling capacity to a verified 8,700MW.

” This figure is a matter of public record and reflects TCN’s ongoing commitment to strengthening Nigeria’s grid infrastructure. 7,300MW cited by PHEDC is outdated and no longer representative of TCN’s current capacity. In fact, with several completed and ongoing projects since the last simulation, a new simulation would certainly show increased capacity.

“Operational Milestones Contradict the 4,000–5,000MW Claim
“Recent, verifiable sector-wide records directly contradict the assertion that TCN can only transmit between 4,000MW and 5,000MW operationally.

“The Nigerian power sector has, in the first quarter of 2025 alone, achieved three successive peak generation milestones, all of which were successfully transmitted by TCN:

“March 4, 2025: Peak generation of 5,801.84MW at 49.69Hz frequency, with a maximum daily energy dispatch of 128,370.75MWh — the highest peak generation and maximum daily energy ever attained in Nigeria’s power sector history.

” TCN successfully transmitted this entire output to Distribution Companies (DisCos) during peak hours.
“March 2, 2025: Peak generation of 5,713.60MW and maximum daily energy of 125,542.06MWh, efficiently transmitted by TCN to all distribution load centres.

“February 14, 2025: Peak generation of 5,543.20MW and maximum daily energy of 125,159.48MWh, also successfully wheeled to DisCos by TCN.

“These figures, independently documented and publicly verifiable, speak for themselves.

” A Call for Accuracy in Power Sector Communication TCN acknowledges that Nigeria’s electricity value chain from gas supply through generation, transmission, and distribution to end users is deeply interconnected, and that each stakeholder has a responsibility to communicate accurately about their role alone and where they need to communicate about others, must take steps to verify information before releasing to the public.

“Misinformation, however unintentional, undermines public trust, misrepresents sector progress, and may negatively influence policy conversations and investment decisions.
“TCN, therefore, calls on all stakeholders to verify information not domiciled with them before publication to ensure their communications accurately reflect the current state of grid infrastructure. TCN remains committed to transparency, collaboration, and the continued growth of Nigeria’s power sector.

Enquiries or requests for clarification on TCN’s current wheeling capacity, infrastructure data, or operational records may be directed to the TCN Public Affairs Division.”

We’ve got the edge. Get real-time reports, breaking scoops, and exclusive angles delivered straight to your phone. Don’t settle for stale news. Join LEADERSHIP NEWS on WhatsApp for 24/7 updates →

Join Our WhatsApp Channel

Nigerians can invest ₦2.5million on premium domains and earn about ₦17-25Million. Earnings in USD. Rather than wonder, click here to find out how it works

Nse Anthony-Uko

Nse Anthony-Uko

Nse Anthony-Uko is a business and financial journalist with over two decades of experience covering Nigeria's financial system, economy, energy sector, corporate landscape, and global economic developments. Her expertise blends frontline journalism with editorial leadership and a strong grasp of financial market dynamics. She has earned multiple professional recognitions and was selected for the International Visitors Leadership Programme (IVLP) in the United States.

OTHER NEWS UPDATES

Keyamo Woos Global OEMs For Nigeria’s Aviation Infrastructure Upgrade
Business

Keyamo Woos Global OEMs For Nigeria’s Aviation Infrastructure Upgrade

1 hour ago
NCAA Appeals To Aviation Unions To Suspend Strike
Business

NCAA, NAICOM Seal Aviation Insurance Pact

2 hours ago
Firm Introduces Ethical Finance To Deepen Financial Inclusion
Business

Firm Introduces Ethical Finance To Deepen Financial Inclusion

3 hours ago
Next Post
Stakeholders Warn Gbajabiamila Against Imposition Of Desmond Elliot For 4th Term In Lagos Assembly

Stakeholders Warn Gbajabiamila Against Imposition Of Desmond Elliot For 4th Term In Lagos Assembly

Advertisement

LATEST UPDATE

Handball: Nigeria Beat Guinea, Qualify For 2027 IHF Men’s U21 World Championship

18 minutes ago

2027: Charismatic Bishops Declare Support For Tinubu, Promise Prayers, Advocacy

48 minutes ago

‎24 Die After Allegedly Consuming Herbal Concoction In Ondo ‎

49 minutes ago

2027: Arewa Revival Project Defends Akpabio, Demands Evidence On Viral Claim

57 minutes ago

ADC North West Gov’ship Candidates Sign Compact For Zonal Security, Development *Back Atiku’s Fuel Subsidy Reversal Proposal 

1 hour ago
Load More
Advertisement
Facebook Twitter Instagram Youtube Whatsapp

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino.