• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Friday, August 8, 2025
Leadership Newspapers
Read in Hausa
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

Kwara Govt To Complete Tunde Idiagbon Flyover In March

by Abdullahi Olesin
2 years ago
in News
Share on WhatsAppShare on FacebookShare on XTelegram

 

Advertisement

The multi-million naira Tunde Idiagbon Flyover along the University of Ilorin road, Tanke, Ilorin, Kwara State will be delivered by the end of March 2023.

The state commissioner for works, Engr Rotimi Iliasu disclosed this during an inspection visit to the project site.

The commissioner said high quality is the number one consideration as contractors ramp up work on the flyover project.

He said the government was unable to complete the project last January as promised because it was the festive period, when people had to travel, adding that the contractor also sought more time to be able to deliver a quality job.

RELATED

WAEC Records 76.36% Pass In 2022 WASSCE

JUST-IN: More Candidates Earn 5 Credits As WAEC Releases Reviewed 2025 WASSCE Results

26 minutes ago
Opposition Will Collapse In Edo Before 2027 – Gov Okpebholo

Gov Okpebholo Nominates Afegbua, Ehijimetor, Eshieshi, Others As Commissioners

60 minutes ago

“We want a good job to be done. We are pushing the contractor, but he is also pleading for more time to be able to deliver a good job…. We keep watching and I am here everyday with the consultant to ensure they do a quality job. By the end of March, we hope to complete it.

“If you come around, maybe in another three to four days, you will see the pace at which the work has been moving. If you were here a week ago, a lot of what you are seeing now would not have come up.

We are looking at six to seven weeks (in March) to complete the project and open the sides to traffic,” Iliasu said.

The commissioner said a part of the bridge will be opened for vehicular use very soon, explaining that his ministry and the consultant in charge are on top of the game to make sure this is achieved for temporary use.

He put the level of work so far done at 82 percent, with an assurance to hand over to Kwarans a project that will stand the test of time and be a pride of the people.

“I can give the level of work done so far on the bridge as 82 percent. What we are hoping to do is that by the end of next week, we can drive a crane to the top of the bridge, where we are standing here. If you look at the other side, the earthwork is between the height of 4.8 meters.

In fact, the earthwork we are doing is about 7.6 meters, we still have asphalt coming on top of it.

“We would have opened the side road; one side is actually ready. But we leave it closed because we still have some concrete work to do. On the other hand, the reason we have not opened it is because of the work which is extended to the road. But all things being equal all this will be completed by the end of next week. We can actually open one side and use the other side for work completely, not about opening for a few hours. We will open it completely for traffic to continue to flow,” he added.

The chief press secretary to the governor, Rafiu Ajakaye, who corroborated Iliasu’s submission, described the progress of work on the bridge as impressive.

“I am impressed. Contrary to what some people may have been saying, you have come here and you have seen the quality of what is ongoing. I am also aware that the consultant in charge of this project is one of the best in the country, so we are confident that what we are putting in place is one of the best in this country,” he said.

“The people of Kwara State have seen what His Excellency AbdulRahman AbdulRazaq is using their funds to do. It is a legacy project that looks beautiful and is located in a strategic place. And I am sure when people visit Kwara, they will be looking forward to climbing this bridge, which will be one of the most beautiful in its aesthetic,” he added.

 


We’ve got the edge. Get real-time reports, breaking scoops, and exclusive angles delivered straight to your phone. Don’t settle for stale news. Join LEADERSHIP NEWS on WhatsApp for 24/7 updates →

Join Our WhatsApp Channel




SendShareTweetShare
Previous Post

I Can Sacrifice My Senatorial Ambition For Obi To Win – Ortom

Next Post

FCTA Promises To Prioritise Young Entrepreneurs’ Projects

Abdullahi Olesin

Abdullahi Olesin

You May Like

WAEC Records 76.36% Pass In 2022 WASSCE
News

JUST-IN: More Candidates Earn 5 Credits As WAEC Releases Reviewed 2025 WASSCE Results

2025/08/08
Opposition Will Collapse In Edo Before 2027 – Gov Okpebholo
News

Gov Okpebholo Nominates Afegbua, Ehijimetor, Eshieshi, Others As Commissioners

2025/08/08
Minister Provides Electricity, Borehole, Renovates School In Niger
News

Nigerian Gov’t, US Partner To Strengthen Visa Compliance

2025/08/08
2023 Elections: Obi Wins FCT With 4 Area Councils
News

Obi Donates N15m To College, Qur’anic Students In Bauchi

2025/08/08
Mining Marshals Shut Down Illegal Quarry In Abuja As 13 Suspects Face Prosecution
News

Mining Marshals Shut Down Illegal Quarry In Abuja As 13 Suspects Face Prosecution

2025/08/08
air force strike
News

NAF Foils Terrorist Attack, Kill Fleeing Insurgents In Borno

2025/08/08
Leadership Conference advertisement

LATEST

JUST-IN: More Candidates Earn 5 Credits As WAEC Releases Reviewed 2025 WASSCE Results

Gov Okpebholo Nominates Afegbua, Ehijimetor, Eshieshi, Others As Commissioners

Nigerian Gov’t, US Partner To Strengthen Visa Compliance

2027: Jonathan Offers Obi Ministerial Slot To Drop Presidential Ambition, Says Kachikwu

Obi Donates N15m To College, Qur’anic Students In Bauchi

Mining Marshals Shut Down Illegal Quarry In Abuja As 13 Suspects Face Prosecution

NAF Foils Terrorist Attack, Kill Fleeing Insurgents In Borno

‘KWAM 1’s Abuja Airport Incident An Act Of Terrorism,’ Says Ex-Kogi SDP Candidate Ajaka

Nizamiye Hospital Denies Complicity In Ex-Niger North Senator’s Death

Police Arrest 5 Suspected Robbers, Ritualist In Akwa Ibom

© 2025 Leadership Media Group - All Rights Reserved.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2025 Leadership Media Group - All Rights Reserved.