• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Monday, September 8, 2025
Leadership Newspapers
Read in Hausa
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

Rising Costs: Delta Warns Contractors Against Project Delay

by Felix Igbekoyi
9 months ago
in News
Share on WhatsAppShare on FacebookShare on XTelegram

Delta State government has warned contractors it would not accept any requests for upward reviews especially when projects were delayed.

Advertisement

The director-general of Delta State Capital Territory Development Agency, (DSCTDA), Patrick Ukah cautioned while flagging off construction of Leo Okonweze Street, off Ezenei Avenue and Odozi Obodo/Aninta/Anenta Street off Ezenei Avenue both in Oshimili South local government area of the state.

The director general said with the availability of all that was needed to have the job done, they were expected to commence work without delay, adding that there will be close monitoring till the end of the project.

He charged contractors to go back to site as any delay which will result in a demand for upward review will not be accepted.

He said that Governor Sheriff Oborevwori has zero tolerance for shoddy jobs and warned that the state government will not spare anybody who is in the job of delivering projects that are not of topmost quality.

RELATED

Wike Will Respond To Tambuwal’s Claims Accordingly — Aide

Wike Will Respond To Tambuwal’s Claims Accordingly — Aide

1 minute ago
2024 UTME: JAMB Approves 747 CBT Centres For Registration, Examination

Nigeria’s Education Sector Is In Trouble, Says JAMB Panel Chair Epelle

7 minutes ago
ADVERTISEMENT

While commending the contractors for kickstarting the projects at the right time and season, he enjoined them to maintain the pace in order to deliver the right quality of work and on schedule.

“The commencement of work on the two roads that link into villages in Asaba were testament of the fulfilment of Governor Sheriff Oborevwori’s MORE Agenda for Deltans” Ukah stated


Join Our WhatsApp Channel



SendShare10169Tweet6356Share
ADVERTISEMENT
Previous Post

Zenith Bank Paris Launch, Dividend Of Trust – Edun

Next Post

Karl Toriola Receives Osun State Merit Award

Felix Igbekoyi

Felix Igbekoyi

You May Like

Wike Will Respond To Tambuwal’s Claims Accordingly — Aide
News

Wike Will Respond To Tambuwal’s Claims Accordingly — Aide

2025/09/08
2024 UTME: JAMB Approves 747 CBT Centres For Registration, Examination
Education

Nigeria’s Education Sector Is In Trouble, Says JAMB Panel Chair Epelle

2025/09/08
PSC Demands Evidence Of Alleged Corruption In Police Recruitment Exercise 
News

We Are Yet To Receive El-Rufai’s Petition Against Police — PSC

2025/09/08
BBNaija10: Faith Breaks Down In Tears After Rooboy ‘s Shocking ‘Eviction’
Entertainment

BBNaija10: Faith Breaks Down In Tears After Rooboy ‘s Shocking ‘Eviction’

2025/09/08
Olubadan-designate Oba Ladoja Pledges Visit, Teaching At Alma Mater
News

Olubadan-designate Oba Ladoja Pledges Visit, Teaching At Alma Mater

2025/09/08
I Won’t Retract Comment On Tinubu Even If Ultimatum Extends To 2027 — Sowore
News

I Won’t Retract Comment On Tinubu Even If Ultimatum Extends To 2027 — Sowore

2025/09/08
Leadership Conference advertisement

LATEST

Wike Will Respond To Tambuwal’s Claims Accordingly — Aide

Nigeria’s Education Sector Is In Trouble, Says JAMB Panel Chair Epelle

We Are Yet To Receive El-Rufai’s Petition Against Police — PSC

BBNaija10: Faith Breaks Down In Tears After Rooboy ‘s Shocking ‘Eviction’

Olubadan-designate Oba Ladoja Pledges Visit, Teaching At Alma Mater

I Won’t Retract Comment On Tinubu Even If Ultimatum Extends To 2027 — Sowore

Nigerian-born Musician Sings For Spanish Soccer Star Yamal

G4EP Launches Free Digital Training For Girls, Says It’s Preparing Them To Rise Above Limitations

1 Resident Dies, 7 Others Injured In Jigawa Building Collapse

Osun Government Widens Internet Access With Free Public WiFi Service

© 2025 Leadership Media Group - All Rights Reserved.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2025 Leadership Media Group - All Rights Reserved.