• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Sunday, June 8, 2025
Leadership Newspapers
Read in Hausa
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

Power Supply: TCN Tackles 2 DisCos For Giving False Info To Consumers

by Bode Gbadebo
1 year ago
in News
Power Supply
Share on WhatsAppShare on FacebookShare on XTelegram

The Transmission Company of Nigeria (TCN) has berated Ibadan Electricity Distribution Company (IBEDC) and Benin Electricity Distribution Company (BEDC) for providing their customers with false information over their (DisCos) inability to supply estimated hours of electricity to the consumers.

Advertisement

The two DisCos had, in separate notices published on their social media handles on different days, blamed their inability to supply estimated hours of power to certain category of customers, to some challenges from TCN installations.

But, TCN, in separate press statements to address the issue on Friday, signed by its general manager, Public Affairs, Ndidi Mbah, faulted both DisCos for blaming it for their failures.

“The Transmission Company of Nigeria hereby notes that the publication circulated by IBEDC on 9th April 2024, which stated that TCN is responsible for its failure to “deliver estimated hours of supply to your feeder”, due to System Outages and Tripping on TCN’s feeders is incorrect.

“That the feeders mentioned in the publication are NOT within the TCN network. This means that most of the listed feeders in the publication are 11kV operated by IBEDC and completely outside TCN’s Operational Control and in IBEDC’s network,” Mbah said.

RELATED

Dangote Refinery’s Completion To Make Naira Stronger

US Provides Third Of Dangote’s Crude Requirement In 2025 Supplies

1 hour ago
Equities To Sustain Positive Sentiment Amidst Audited Earnings Expectations

Consumer Goods Sector Drives NGX Growth With 40.65% Increase

1 hour ago

The TCN spokesperson added that while the company sees the misinformation of IBEDC as a ploy to undermine and mislead the public against regular power supply, it remained focused on supporting the government’s move towards a more robust and efficient power supply.

“Consequently, TCN assures the public of its commitment to continue to work hard to effectively transport the entire bulk electricity received from the generating companies to distribution load centres nationwide,” he stated.

Also, TCN faulted the publication on BEDC’s social media platform on April 12, 2024 on its inability to supply 20 hours of power supply to its Band A customers.

“We hereby note that BEDC attributed this to tripping due to earth fault at Amukpe and tripping due to an XLPE cable puncture at Effurun, both TCN substations, is not correct.

“The incorrect attribution of these faults to TCN is clearly shown in the table on that release by IBEDC.

“For clarity, we note that on the 11th of April 2024, the Amukpe 33kV feeder tripped at 2:31pm. and was restored by 4.08pm within 1 hour and 54 minutes.

“The cause of the outage, which was clearly under BEDC purview, was an instantaneous earth fault caused by stormy weather, which was restored on trial reclosure after the rain had subsided.

“Still, on the 11th of April 2024, Effurun 33kV feeder tripped at 12:25 p.m., and it is still out. The cause of the tripping was an earth fault on the outgoing feeder upriser, also from the BEDC DISCO end.

“This report is to set the records straight and to appeal that facts be stated as they are for the benefit of all,” Mbah added.


We’ve got the edge. Get real-time reports, breaking scoops, and exclusive angles delivered straight to your phone. Don’t settle for stale news. Join LEADERSHIP NEWS on WhatsApp for 24/7 updates →

Join Our WhatsApp Channel

START EARNING US DOLLARS as a Nigerian ($35,000) monthly. Companies are sacking their workers due to AI (artificial intelligence), business owners are in panic mode. Only the smart will make it. Click here


Tags: Power SupplyTCN
SendShareTweetShare
Previous Post

Minister Hails Troops For Killing Terror Kingpins In North-West

Next Post

I Collected $3m For Emefiele, Witness Tells Court

Bode Gbadebo

Bode Gbadebo

You May Like

Dangote Refinery’s Completion To Make Naira Stronger
Business

US Provides Third Of Dangote’s Crude Requirement In 2025 Supplies

2025/06/08
Equities To Sustain Positive Sentiment Amidst Audited Earnings Expectations
Business

Consumer Goods Sector Drives NGX Growth With 40.65% Increase

2025/06/08
JUST IN: Nigerian Stocks End 8-Day Gains As Banks Slide
Business

‘Dangote Petrochemicals Listing To Boost Nigeria’s Stock Market’

2025/06/08
NLNG Ties 2023 Science Quiz Competition To Net Zero Emission
Business

NLNG Launches Human Capital Devt Programme Under Train 7 Project

2025/06/08
SEC Warns Nigerians Against Unregistered Investment Schemes
Business

New Meme Coin, PUNISHER COIN, Not Registered – SEC

2025/06/08
UNOC3: Nigeria, Private Sector Operators Urged To Protect Oceans
World News

UNOC3: Nigeria, Private Sector Operators Urged To Protect Oceans

2025/06/08
Leadership Conference advertisement

LATEST

Harnessing Visual Communications To Strengthen Electoral Process

The Ministry Of Personal Deliverance (PART 11)

Tinubu And Arewa

Of Eid, Sacrifice, And The Politics Of Hope

Understanding Lumbar Spondylosis: What Your Lower Back Is Telling You

US Provides Third Of Dangote’s Crude Requirement In 2025 Supplies

Consumer Goods Sector Drives NGX Growth With 40.65% Increase

‘Dangote Petrochemicals Listing To Boost Nigeria’s Stock Market’

NLNG Launches Human Capital Devt Programme Under Train 7 Project

New Meme Coin, PUNISHER COIN, Not Registered – SEC

© 2025 Leadership Media Group - All Rights Reserved.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2025 Leadership Media Group - All Rights Reserved.