• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Monday, August 25, 2025
Leadership Newspapers
Read in Hausa
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

Apapa Traffic: NPA Seeks Speedy End To Repairs On Port Access Roads

by Yusuf Babalola
3 years ago
in Business
Apapa Traffic
Share on WhatsAppShare on FacebookShare on XTelegram

The Nigerian Ports Authority (NPA), has appealed to the contractors responsible for the ongoing repairs on the two major arteries into the ports in Lagos, the Apapa-Oshodi Expressway and the Leventis Bridge on the Apapa-Wharf Road, to hasten the repair works in order to ease movement of trucks in and out of the ports.

Advertisement

It also appealed to the Lagos State Government to work with the Authority to clear up the traders that are occupying nearly half of the newly constructed roads in order to free up the port access roads.

Speaking yesterday in Lagos after the tour of Apapa/Tin-Can/ Mile 2 access roads to the ports, the managing director of NPA, Mohammed Bello-Koko, called on Buildwell Construction and HITECH Construction, contractors in charge of works on the Leventis Bridge and Apapa-Oshodi Expressway respectively, to work 24/7 round-the-clock to see to the early completion of the roads.

According to him, the opening of the Leventis Bridge is critical because shutting it down to traffic has started affecting port operations.

He said the ports have started witnessing a longer waiting time for vessels, a longer dwell time of cargo at the port and the cost of transportation has also gone up because of the shutdown.

RELATED

JUST-IN: NAICOM Revokes Operational Licenses Of Niger Insurance, Standard Alliance

Delayed Guidelines Drag Insurance Recapitalisation Process

13 hours ago
Large-cap Stock Drives Local Bourse To N180bn Gains

Shareholders Get N117.86bn Half-year Dividends From 12 Listed Firms

13 hours ago
ADVERTISEMENT

“With the closure of the Leventis Bridge, everything is almost at a standstill. This road is critical to the economy and the nation at large. We understand the importance of closing the bridge around Leventis for repair to avoid a collapse but it is seriously impacting port operation,” Bello-Koko said.

He said the situation was due to the fact that Western Avenue has been the major means of movement of cargo into both Tin-Can and Apapa Ports since 2021 when the Cele/Mile 2/ Sunrise end of the Apapa-Oshodi Expressway was closed to traffic for construction.

He, however, said that the NPA has been able to get the commitment of HITECH to deliver the first section of the road from Sunrise to Mile 2 in about 30 days, which would be by the end of October before continuing with the second section.

ADVERTISEMENT

On the security concerns discouraging the contractors from working at night, he said the NPA has gotten the commitment of AIG Maritime and plans to also speak with other security agencies to provide security for the contractors to work at night.

On his part, representative of HITECH Construction, Robert Turnor,  said that issue of insecurity has been a challenge to workers and property on the site, thereby limiting work at night.

The president general of the Maritime Workers Union of Nigeria (MWUN),

Adewale Adeyanju, who said that the road situation is impacting negatively on the health of both maritime workers and port users, said that many importers have moved their businesses to the ports in neigbouring countries.

He expressed sadness that a sizable portion of the Tin-Can Island Road has been turned into a marketplace where people are buying and selling, which is now creating serious security threats to lives and property.

He called on the government to declare a state of emergency on the roads leading to the ports because Nigeria is losing lots of revenue to the state of the road.

 


Join Our WhatsApp Channel

Nigerians can now earn US Dollars monthly by acquiring domains cheaply and reselling for profits up to $18,000 (nearly ₦30Million). Beneficiaries include professionals, entrepreneurs, civil servants and more. Click here to start.


Tags: Apapa Traffic
SendShare10169Tweet6356Share
ADVERTISEMENT
Previous Post

NCC Urges Firmware Update After Lenovo Found Vulnerabilities

Next Post

CBEA, ENGIE Seal $60m Mini-grids Project In Nigeria

Yusuf Babalola

Yusuf Babalola

You May Like

JUST-IN: NAICOM Revokes Operational Licenses Of Niger Insurance, Standard Alliance
Business

Delayed Guidelines Drag Insurance Recapitalisation Process

2025/08/25
Large-cap Stock Drives Local Bourse To N180bn Gains
Business

Shareholders Get N117.86bn Half-year Dividends From 12 Listed Firms

2025/08/25
UBA Bank plc
Business

UBA Customers To Win N150m In Super Savers Promo

2025/08/25
Bureau Rate NIMASA High On Public Service Reforms
Business

NIMASA, Engineers Strengthen Collaboration For Blue Economy Growth

2025/08/25
Ojulari’s First 100 Days at NNPC Ltd: A Bold Start Anchored On Reform, Transparency, And Clean Energy
Business

After 3 Misses, NNPC Sets Nov For AKK Gas Pipeline Completion

2025/08/25
Job Losses: 483,464 Persons Withdraw N247.47bn From Pension Savings
Business

Board Inauguration Beyond Our Control, PenCom Responds To NLC

2025/08/25
Leadership Conference advertisement

LATEST

ACF: PDP, Other Parties’ Zoning Not Covered By Constitution

Wike Vindicated Over PDP Zoning Of Presidency To South, Party Chair To North — Aide

OOPL Operation: Court Jails 5 More Internet Fraudsters

Federal Gov’t Signs BASA Agreement For Direct Flights To Brazil

Shettima Hails Zulum At 56

Federal Gov’t Issues Fresh Flood Alert To 9 Northern States

Kano Gov’t Denies Alleged Diversion Of Public Funds By Gov’s Top Aide

BREAKING: PDP Zones 2027 Presidential Ticket To South

JUST-IN: PDP Confirms Damagum As Substantive National Chairman

Federal Gov’t Unveils Digital Portal For Teacher Registration

© 2025 Leadership Media Group - All Rights Reserved.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2025 Leadership Media Group - All Rights Reserved.