• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Tuesday, July 21, 2026
Leadership Newspapers
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
Hausa Edition
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

Intrigues Stall Evacuation Of 450mw From Zungeru Hydro Plant

Jerry Emmason by Jerry Emmason
2 years ago
in Cover Stories, News
zungeru
Share on WhatsAppShare on FacebookShare on XTelegram

High-level intrigues and politics have stalled the effective transmission of 450 megawatts generated by the newly inaugurated Zungeru Hydro Power plant to the national grid, LEADERSHIP Sunday has learnt.

The plant, which has an installed capacity of 700 megawatts, cannot transmit effectively to the national grid due to the absence of certain cables.

It was also learned that unlike other hydropower dams, which are of lower capacity, the cable required for power step-down and evacuation by the new dam is higher in voltage.

A source in the facility told LEADERSHIP Sunday that heavy pylon cable is required, which the Transmission Company of Nigeria (TCN) should have provided. However, Mainstream Energy Ltd, which won the concession, was awarded the contract to provide the cable.

The source, who preferred to be anonymous, alleged high-level intrigues and vested interests to reverse the concession to Mainstream Energy, which won the bid in the last days of the Muhammadu Buhari administration.

It was learnt that some vested interests are working assiduously to frustrate the transmission of the power generated from the plant to the national grid, making the company look ineffective and incompetent.

Our correspondent learnt that interests want to frustrate the transmission process to reverse the concession to the company. Hence, last month, Mainstream Energy was awarded the contract to supply the pylon cable.

It was further revealed that the plant has started partial transmission to the Giuseppe-Shiroro-Katampe line. At the same time, the pylon cable will also be laid from Kaduna to Zungeru so that the power generated can be evacuated and effectively transmitted to the national grid.

When contacted, the officer in charge of transmission in Zungeru Dam, Yahaya Ndace, confirmed that the company was generating over 400 megawatts and fluctuating.

On whether it is on the national grid, he said, “We are on the national grid.” When asked further whether they are encountering any problems being on the grid, he said, “Zungeru is on the national grid, no problem.”

RELATED NEWS

NPC Begins Digital Birth, Death Registration In Kogi

Manufacturers Withdraw Lawsuit Against FG, Clears Path for 1.55m Meters Procurement

Senate Advances Bill To Overhaul Nigeria’s Food, Drug Regulation Laws

An official of the Federal Ministry of Power told LEADERSHIP Sunday that he would look into the issue and revert

However, as of the time of filing this report last night, he had not provided the clarification.

We’ve got the edge. Get real-time reports, breaking scoops, and exclusive angles delivered straight to your phone. Don’t settle for stale news. Join LEADERSHIP NEWS on WhatsApp for 24/7 updates →

Join Our WhatsApp Channel

BREAKING NEWS: Nigerians can now earn as much as $15,000- $25,000 with premium domains. You decide if you want payment in Naira or US Dollars. Be sure to ask for evidence and proof of people benefitting daily from this. CLICK HERE TO START
Jerry Emmason

Jerry Emmason

OTHER NEWS UPDATES

NPC Begins Digital Birth, Death Registration In Kogi
North Central

NPC Begins Digital Birth, Death Registration In Kogi

3 hours ago
Manufacturers Withdraw Lawsuit Against FG, Clears Path for 1.55m Meters Procurement
News

Manufacturers Withdraw Lawsuit Against FG, Clears Path for 1.55m Meters Procurement

3 hours ago
News

Senate Advances Bill To Overhaul Nigeria’s Food, Drug Regulation Laws

4 hours ago
Next Post
‘FG’s N37bn Road Project Refund Was Paid To Amosun, Not Abiodun’

Presidential Jets Seizure: Chinese Firm Plotting To Scam Nigeria – Amosun

Advertisement

LATEST UPDATE

2027: RHGN Launches South-East Campaign, Urges Voter Participation

7 minutes ago

Frontier Basins Draw Record Interest as NUPRC Awards 37 Blocks To 31 Firms

15 minutes ago

NSIB, NIMASA Partner On Maritime Safety, Data Sharing

31 minutes ago

NGF, AFC Deny Suspension Claim, Threaten Legal Action Over False Report

57 minutes ago

2027: Tinubu Supporters Dismiss Kwankwaso’s criticism Of Muslim-Muslim Ticket

1 hour ago
Load More
Advertisement
Facebook Twitter Instagram Youtube Whatsapp

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino.