• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Friday, June 5, 2026
Leadership Newspapers
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
Hausa Edition
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

Senate To Resuscitate Kaztec Engineering Facility

LEADERSHIP News by LEADERSHIP News
3 years ago
in News
Senate
Share on WhatsAppShare on FacebookShare on XTelegram

The Senate has begun move to resuscitate the moribund Kaztec Engineering Facility at Snake Island, Ilase, Lagos State.

The move is part of the upper legislative chamber’s commitment to investigating the reasons behind the project’s shutdown with a view to seek solutions for reviving the facility toward revitalise the Nigerian economy.

The chairman Senate Committee on upstream petroleum, Senator Eteng Williams, led his committee members to the Kaztec fabrication yard on Saturday for an on-site inspection and to ascertain the level of degradation suffered by the facility since its eight years of inactivity owing to a force majeure declared on it in 2015.

This is coming few weeks after the Anambra State governor, Prof. Chukwuma Soludo visited the site with various stakeholders for an on-the-spot assessment. The Governor had called on President Tinubu to look into the concerns as the facility has the potential of changing the face of the Nigerian Oil and gas sector.

Mr Mike Simpson, the technical director of Kaztec Engineering, during the tour stated that the facility had been operational, employing over 10,000 people both directly and indirectly until a force majeure incident in February 2015 which led to its shutdown. He lamented that jobs have been lost, equipment and material worth billions of dollars had been abandoned leading to business failures.

During the inspection tour, Senator Etang Williams pledged that his Committee would carry out a comprehensive investigation, identify the factors that led to the project’s current status, while ensuring that justice is served to all the parties. He also assured that the visit had afforded the Committee first hand knowledge and would lead to effective formulation of policies for the revival of the Company to prevent future occurrence.

RELATED NEWS

EFL Reduces Transfer Bans For Defaulting Clubs To One Window

War-Troubled Iran Holds Spain To 1-1 Draw In World Cup Test Match

Sani Mu’azu: A Pillar Of Northern Nigerian Cinema

He said; “We’ve seen it all. We’re going back to the drawing board and we will call everyone involved.

“We have the assurances of the Senate President because we all want this country to work for everyone”

“We’re committed to make things work and we’re assuring all stakeholders that justice will be done.”

Present at the visit were Committee members including the deputy chairman of the committee, Senator Allwell Iheanacho Onyesoh, Senator Nwaebonyi Onyeka, Senator Victor Umeh, Senator Tony Nwoye, Senator Asuquo Ekpenyong, Senator Darlington Nwokocha, Senator Osita Ngwu, as well as representatives from NUPRC and other Regulatory Agencies.

Kaztec Engineering Limited is a 100 per cent indigenous Engineering, Procurement, Installation, Construction, and Management (EPIC-M) Company.

Incorporated in 2005, Kaztec became the pace setter EPIC-M company in Onshore/Offshore Pipelines and Facilities Engineering until Addax Petroleum Limited declared a controversial force majeure that has led to job losses, financial and economic losses, business failures and consequential challenges that have brought the Company to its present status.

We’ve got the edge. Get real-time reports, breaking scoops, and exclusive angles delivered straight to your phone. Don’t settle for stale news. Join LEADERSHIP NEWS on WhatsApp for 24/7 updates →

Join Our WhatsApp Channel

Nigerians can invest ₦2.5million on premium domains and earn about ₦17-25Million. Earnings in USD. Rather than wonder, click here to find out how it works
LEADERSHIP News

LEADERSHIP News

OTHER NEWS UPDATES

EFL Reduces Transfer Bans For Defaulting Clubs To One Window
News

EFL Reduces Transfer Bans For Defaulting Clubs To One Window

13 minutes ago
War-Troubled Iran Holds Spain To 1-1 Draw In World Cup Test Match
News

War-Troubled Iran Holds Spain To 1-1 Draw In World Cup Test Match

14 minutes ago
Sani Mu’azu: A Pillar Of Northern Nigerian Cinema
Feature

Sani Mu’azu: A Pillar Of Northern Nigerian Cinema

43 minutes ago
Next Post
Conquering Marauding Internet Fraudsters Through Vigilance

Internet Traffic: IXPN Targets 1Tbps By End Of 2024

Advertisement

LATEST UPDATE

Find New Revenue Stream Or Face Deeper Funding Crisis, FUTIA Don Urges Varsities

10 minutes ago

EFL Reduces Transfer Bans For Defaulting Clubs To One Window

13 minutes ago

War-Troubled Iran Holds Spain To 1-1 Draw In World Cup Test Match

14 minutes ago

SON Backs African Quality Mark Certification Framework To Reduce AfCFTA Barriers

40 minutes ago

Global Securities Regulator Wants Stronger Fund Valuation Rules For Investor Confidence

41 minutes ago
Load More
Advertisement
Facebook Twitter Instagram Youtube Whatsapp

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino.