• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Saturday, October 24, 2026
Leadership Newspapers
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
Hausa Edition
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

TCN’s $1.16bn Donor-funded Projects Boost Line Upgrades to 240MW, Deliver 82 Transformers

Nse Anthony-Uko by Nse Anthony-Uko
8 months ago
in Business
TCN Grid scaled 1
Share on WhatsAppShare on FacebookShare on XTelegram

Transmission Company of Nigeria (TCN) has reported the completion of line upgrades and installation of 82 power transformers between January 2024 and November 2025, with support from $1.16 billion in donor funding.

In a detailed scorecard of its achievements under the managing director, Dr Sule Ahmed Abdulaziz, released on Wednesday, the TCN stated that transmission capacity has grown to 8,500MW and that efforts include rehabilitating substations and re-conductoring transmission lines.

TCN added that overall network performance is measured by the electrical energy wheeled through the system. Line upgrades included increasing the Sokoto–Birnin Kebbi line from 70MW to 150MW and the Ikeja West–Alimosho–Ogba–Alausa lines from 120MW to 240MW.

TCN reported completing reconductoring on the Delta–Effurun 132kV line, the Ayede–Eleyele–Jericho line, and the Osogbo–Ede/Iwo 132kV double circuits. Contracts were awarded for 21 additional lines, including the 107km 330kV Onitsha–New Haven line and the 104km Shiroro–Mando 330kV line upgraded to quad conductor. These form part of the Nigerian Electricity Grid Maintenance, Expansion and Rehabilitation Programme (NEGMERP).

TCN commissioned 82 power transformers nationwide from January 2024 to November 2025, adding 8,500.50 MVA to the grid. In the second half of 2025, TCN installed 15 transformers with a capacity of 300 MVA at the Akangba, Lekki, Alagbon, Ikeja West, Osogbo (twice), Ganmo, Jos, Gombe, Kumbotso, Asaba, Oke-Aro, Benin, Alaoji, and Katampe substations. TCN noted that prior installations used up to 150 MVA of capacity and that plans exist for additional 300 MVA units.

According to the scorecard, the TCN recorded a peak transmission of 5,801.84MW and a daily energy of 128,370.75 MWh on March 4, 2025, while the national grid remained stable for 421 days from July 20, 2022, to September 13, 2023. TCN reported a 76.47 per cent reduction in grid disturbances, with two disturbances from January to August 2025 and no collapses.

The company noted that through its Project Management Unit, it is implementing donor-funded projects supported by AFD, AFDB, JICA, and World Bank. Completed projects include five substations—two 330kV and three 132kV—plus a 330kV line under the Abuja Feeding Scheme supplying Lafia. The Ogun–Lagos project, involving six substations and 330kV/132kV lines, is pending compensation processes.

RELATED NEWS

CBN Moves To Tackle Payment Barriers In Nigeria-China Trade

Solar Panels Become Nigeria’s New Wedding Gift As Power Costs Rise – Bloomberg

MSMEs, Analysts Say CBN Rate Cut Yet To Ease Credit As Private Lending Falls By N537.6bn

Other completed works include the Kaduna–Jos 330kV double-circuit line, the Oke-Eletu 132/33kV line, the transposition of the 330kV Makurdi–Aliade–Ugwuaji line, and the reconstruction of the Ikorodu–Shagamu 132kV line from a 150mm² single circuit to a 250mm² double circuit.TCN reported restocking central stores with transformers, spare parts, and maintenance and project equipment.

The company said it deployed the Generation Dip/Loss Detection System (GLDS) and Internet of Things (IoT) for grid monitoring. TCN conducts regular inspections, preventive maintenance, and repairs, including reactor installations at substations.

It also launched a booklet on the Grievance Mechanism to address project delays.

TCN stated it aims to establish a transmission network capable of wheeling power generation to distribution load centres.

We’ve got the edge. Get real-time reports, breaking scoops, and exclusive angles delivered straight to your phone. Don’t settle for stale news. Join LEADERSHIP NEWS on WhatsApp for 24/7 updates →

Join Our WhatsApp Channel

BREAKING NEWS: Nigerians can invest ₦2.5million on premium domains and earn about ₦17-25Million. Earnings in USD. Rather than wonder, click here to find out how it works

Nse Anthony-Uko

Nse Anthony-Uko

Nse Anthony-Uko is a business and financial journalist with over two decades of experience covering Nigeria's financial system, economy, energy sector, corporate landscape, and global economic developments. Her expertise blends frontline journalism with editorial leadership and a strong grasp of financial market dynamics. She has earned multiple professional recognitions and was selected for the International Visitors Leadership Programme (IVLP) in the United States.

OTHER NEWS UPDATES

CBN Moves To Tackle Payment Barriers In Nigeria-China Trade
Business

CBN Moves To Tackle Payment Barriers In Nigeria-China Trade

4 hours ago
Solar Panels Become Nigeria’s New Wedding Gift As Power Costs Rise – Bloomberg
Business

Solar Panels Become Nigeria’s New Wedding Gift As Power Costs Rise – Bloomberg

7 hours ago
MSMEs, Analysts Say CBN Rate Cut Yet To Ease Credit As Private Lending Falls By N537.6bn
Business

MSMEs, Analysts Say CBN Rate Cut Yet To Ease Credit As Private Lending Falls By N537.6bn

8 hours ago
Next Post
Cooking Gas Sells For N900 Per Kg In Anambra

Cooking Gas Prices Rise As Petrol Hike Bites Harder

LATEST UPDATE

Extreme Heat: 10 Things Nigerians Should Do to Prepare For El Niño as Report Projects 31,400 Deaths

6 minutes ago

Back Tinubu Now, Shelve Presidential Ambition Till 2031 – Akume Tells Northerners 

25 minutes ago

Rivers Lawyers Accuse VeryDarkMan Of Defaming Jordan Wike, Demand Apology

32 minutes ago

Remi Tinubu: We’ll Give Those Who Don’t See Nigeria’s Changes ‘Tinubu Eyeglasses 

33 minutes ago

2027: Any Northerner Contesting For Presidency Misleading Arewa – Akume

34 minutes ago

2027: 8 Reasons Why Tinubu’s APC Presidential Campaign Flag-Off in Kaduna Matters

45 minutes ago

Lawmaker, Experts Push For Funding, Legislative Intervention To Fix Healthcare Deficits

47 minutes ago

FULL LIST: Paramilitary Promotions Under Tinubu From 2023 To 2026

1 hour ago

Ebola: FG Strengthens Entry Screening Over Reported Protocol Breaches

1 hour ago

2027: APC Scribe, Basiru, Rallies Ex-Assembly Speakers, Deputies For Tinubu

1 hour ago
Load More
Facebook Twitter Instagram Youtube Whatsapp

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino | Polskie Kasyno.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino | Polskie Kasyno.