• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Sunday, June 14, 2026
Leadership Newspapers
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
Hausa Edition
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

NDPHC Invests N500bn In Transmission Infrastructure – NDPHC

...As Adighije inspects Lafia substation

Jerry Emmason by Jerry Emmason
1 year ago
in Business
NDPHC
Share on WhatsAppShare on FacebookShare on XTelegram

The Niger Delta Power Holding Company (NDPHC) has invested approximately N500 billion in transmission infrastructure nationwide, with the Lafia 330/132/33kV Transmission Substation serving as a flagship project, managing director Engr. Jennifer Adighije disclosed during an inspection tour of the facility on Thursday.

LEADERSHIP checks indicate that the Lafia substation’s initial contract was valued at approximately N5.49 billion.

Accompanied by senior executives including Engr. Kassim Abdullahi (Generation), Dr. Steven Andzenge (Legal Services), and Engr. Bello Babayo Bello (Networks), Adighije described the Lafia substation—commissioned in 2022—as a “world-class” facility critical to Nigeria’s power grid. The substation, equipped with two 150MVA and two 60MVA transformers, has enhanced electricity supply to Nasarawa State and neighboring regions.

Adighije emphasised NDPHC’s role in bridging transmission gaps, stating: “We are unrelenting in scaling infrastructure to evacuate stranded generation capacity.” She attributed grid limitations to transmission constraints rather than generation shortcomings, noting that NDPHC’s power plants often outstrip existing evacuation capabilities.

Constructed by NDPHC and commissioned in 2022, the substation is a critical component of Nigeria’s power infrastructure.

Speaking after the inspection,  Adighije described the facility as world-class, noting that it has significantly improved the quality of power supply to Nasarawa State and surrounding states.

The NDPHC MD was accompanied on the visit by the Executive Director Generation, Engr. Kassim Abdullahi, Executive Director, Legal Services, Dr. Steven Andzenge, and Executive Director, Networks, Engr. Bello Babayo Bello.

She emphasized that as a government intervention agency, NDPHC has invested approximately N500 billion in developing transmission infrastructure and networks across the country.

She said: “We are at the Lafia transmission substation, which is a project that was delivered by NDPHC and handed over to the transmission company of Nigeria. It’s a 330/132/33KV transmission substation, comprising two numbers 150 MVA transformers, two numbers 60 MVA transformers, and one by 75 MVA reactor.

“And as you can see, this is a project that was delivered to world-class standards. By every standard, this is one of the best that one can ever find internationally, in line with global best practices and standards. And as the mandates of the NDPHC were very clear in terms of our delivery of projects, because we are an entity essentially that provides backbone services for the sector, ensuring that we deliver projects that would impact the entire gas to electricity value chain”.

The NDPHC CEO pointed out that “NDPHC has invested over N500 billion in transmission projects, transmission lines, transmission infrastructure, line-bay extensions, transformers, substations, you name it, across the entire power sector.

“And in spite of the liquidity crisis that we are facing, we are here to reaffirm our commitment to Mr. President’s Renewed Hope Agenda, which aims to scale power generation, transmission, and distributed access to electricity”.

She debunked the claim that the company is unable to generate power optimally, stressing that the company has more capacity than transmission can carry.

“Let me put it to Nigerians, that for those that have been saying that the NDPHC were unable to generate optimally, the real issues are that we actually have a generation in excess of the transmission availability. And therefore, at NDPHC we are unrelenting, we are undeterred, and will continue to dedicate resources to ensure that we scale transmission to evacuate the stranded generation that we have”.

RELATED NEWS

Non‑oil Tax Worries Grow As Company Income Tax Drops 31% in Q1

Ghana Opens Basins, Eyes AOW Energy For Deals

Digital Economy Depends On Strong Payments Infrastructure’

Adighije who also led the team on a courtesy visit to the Governor of Nasarawa State, Engr Abdullahi Sule, thanked the governor for his support for the company.

She noted that the enactment of the Electricity Act has opened up the sector, with stakeholders now able to transact business bilaterally.

“And therefore, we are now empowered to be able to stimulate market activities, even here in Nassarawa State, that would ensure that we deliver access to electricity to the last mile that would be of benefit to Nassarawa State, NDPHC and would be of benefit to the common good of Nigerians”, she added.

Governor Sule in his response praised Adighije for leadership qualities, stating that her arrival at the company has led to significant transformation.

He observed that despite having the excellent transmission facility, power supply to the state has been challenging due to poor distribution network.

“We are actually probably transmitting less than we can distribute. So you need all those partners. So the way you are visiting me, please visit all these DisCos.

“It’s very important for them to know that it’s a total waste for you to end up generating this and they are not taken because you need off-takers when you generate. If the off-takers are not taking load, you cannot make your money”, he noted.

 

 

We’ve got the edge. Get real-time reports, breaking scoops, and exclusive angles delivered straight to your phone. Don’t settle for stale news. Join LEADERSHIP NEWS on WhatsApp for 24/7 updates →

Join Our WhatsApp Channel

Nigerians can invest ₦2.5million on premium domains and earn about ₦17-25Million. Earnings in USD. Rather than wonder, click here to find out how it works
Jerry Emmason

Jerry Emmason

OTHER NEWS UPDATES

VAT Revenue Rises By 4.4%To N588bn In Q1 – NBS
Business

Non‑oil Tax Worries Grow As Company Income Tax Drops 31% in Q1

6 hours ago
Marginal Field Awardees: NUPRC Restates Commitment To Transparency Culture
Business

Ghana Opens Basins, Eyes AOW Energy For Deals

6 hours ago
e-payment channel
Business

Digital Economy Depends On Strong Payments Infrastructure’

6 hours ago
Next Post
Soneye Named NIPR Spokesperson Of The Year For Transforming NNPCL Communications

Soneye Named NIPR Spokesperson Of The Year For Transforming NNPCL Communications

Advertisement

LATEST UPDATE

Oyintiloye Urges Nigerians To Stay Hopeful, Says Insecurity Will End

14 minutes ago

Three Abuja Districts Where You’re Likely To Find Fresh Awara

17 minutes ago

Ayetoro Town Sinks As Sea Swallows Homes, Hopes

47 minutes ago

Owa-Onire: The Kwara Community Bandits Chased Away

54 minutes ago

Lured To Negotiate, Taken Hostage: 39 Zamfara Elders In Bandits’ Den

57 minutes ago
Load More
Advertisement
Facebook Twitter Instagram Youtube Whatsapp

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino.