• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Saturday, July 12, 2025
Leadership Newspapers
Read in Hausa
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

No Explosion At Warri Refinery, Routine Maintenance Ongoing –NNPC

by Nse Anthony - Uko
5 months ago
in Business
NNPC
Share on WhatsAppShare on FacebookShare on XTelegram

Contrary to reports, the Nigerian National Petroleum Company Limited (NNPC) has clarified that there was no explosion at the Warri Refining and Petrochemical Company (WRPC).

Advertisement

The NNPC said on January 25, 2025, operations at WRPC Area 1 were intentionally curtailed to carry out necessary intervention works on select equipment, including field instruments that were impacting sustainable and steady operations.

The national oil company noted that despite ongoing interventions, over the past 11 days, AGO loading has been maintained at an average of eight trucks per day, with a sufficient supply available to sustain ongoing truck loadout operations.

The Warri Refinery recently resumed operations after a decade-long closure, marking a significant milestone for Nigeria’s oil industry. The refinery is currently operating at 60 per cent capacity, producing diesel and kerosene.

NNPC has assured that all safety protocols are in place to prevent any major incidents.
“NNPC Ltd wishes to clarify that there was no explosion at the Warri Refining and Petrochemical Company (WRPC). Any reports suggesting otherwise are completely false.

RELATED

Lawmakers, Marítime Workers Kick Over NPA’s 50% Federation Account Remittances

NPA Bags NASS’ Transparency Award

7 minutes ago
UBA Unveils ‘Scan To Resolve Complaint’ Portal For Enhanced Customer Experience

Entrepreneurs Charged On Value, Sustainable Partnerships At UBA Business Series

45 minutes ago

“On January 25, 2025, operations at WRPC Area 1 were intentionally curtailed to carry out necessary intervention works on select equipment, including field instruments that were impacting sustainable and steady operations.

“These intervention works are essential to ensure the production of on specification finished and intermediate products, particularly Automotive Gas Oil (AGO) and Kerosene (Kero).

“The routine maintenance is progressing as planned, and Area 1 will be back in operation within the next few days. “Despite ongoing interventions, over the past 11 days, AGO loading has been maintained at an average of eight

trucks per day, with a sufficient supply available to sustain ongoing truck load-out operations.

“NNPC Ltd remains committed to ensuring uninterrupted product supply and appreciates the patience and cooperation of all stakeholders as it completes these essential maintenance activities,” the company said.


We’ve got the edge. Get real-time reports, breaking scoops, and exclusive angles delivered straight to your phone. Don’t settle for stale news. Join LEADERSHIP NEWS on WhatsApp for 24/7 updates →

Join Our WhatsApp Channel



Tags: Nigerian National Petroleum Company Limited (NNPCL)Warri Refinery
SendShareTweetShare
Previous Post

MAN Advocates Increase In Electricity Supply

Next Post

Cutting Electricity Cost Through Energy-saving Electronics

Nse Anthony - Uko

Nse Anthony - Uko

You May Like

Lawmakers, Marítime Workers Kick Over NPA’s 50% Federation Account Remittances
Business

NPA Bags NASS’ Transparency Award

2025/07/12
UBA Unveils ‘Scan To Resolve Complaint’ Portal For Enhanced Customer Experience
Business

Entrepreneurs Charged On Value, Sustainable Partnerships At UBA Business Series

2025/07/12
AKK Pipeline: A Game-Changer for Northern Nigeria’s Energy Landscape
Feature

AKK Pipeline: A Game-Changer for Northern Nigeria’s Energy Landscape

2025/07/12
DBN Harps On Education’s Impact Against Climate Crisis
Business

DBN To Train Entrepreneurs On Business Growth, Sustainability

2025/07/12
Coleman Wires To Boost Local Content Awareness
Business

Coleman Invests N700bn In 20 Years

2025/07/12
Sokoto Gov’t Settles N500m Outstanding Fees For Foreign Students
Business

Turkish Airlines Named ‘Expatriate Airline Of The Year’ At TEBA 2025

2025/07/11
Leadership Conference advertisement

LATEST

Raising Voices, Shaping Futures: Why Kids Must Be Heard

What We Often Miss In Raising Resilient Kids

NPA Bags NASS’ Transparency Award

Kaduna Hosts Hearing On Constitution Amendment Today

Abia Govt Raises N3.4bn For Security Trust Fund

Citizen Emenike And Steve Osuji’s Campaign Of Calumny Against The EFCC

The Silent Safety Guardian

Unexplained Wealth Bill: Fighting Corruption Or Missing The Point?

Opposition Coalition: A Make-or-Break Moment for APC In 2027

Habeeb’s Triumph: A Blind Man’s Unsual Journey To Seat Of Power

© 2025 Leadership Media Group - All Rights Reserved.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2025 Leadership Media Group - All Rights Reserved.