• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Wednesday, July 8, 2026
Leadership Newspapers
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
Hausa Edition
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

Turkey’s Akkuyu Nuclear Power Plant Gets Turbine Installation 

LEADERSHIP News by LEADERSHIP News
2 years ago
in Foreign News
IMG 20241223 WA0018
Share on WhatsAppShare on FacebookShare on XTelegram

Turbine installation has been completed at Unit 1 of Akkuyu Nuclear Power Plant (NPP) being the first NPP built in the Republic of Turkey.

 

Turkey’s Minister of Energy and Natural Resources, Alparslan Bayraktar, disclosed the development along with the Director General of the Rosatom State Corporation, Alexey Likhachev, who visited the event dedicated to the pivotal step.

 

He said, “To address Turkey’s increasing energy demand and achieve the 2053 Net-Zero Emission Target, we need nuclear energy. The Akkuyu NPP project is one of the largest projects in our country. Its implementation reflects the political will of our President, President of the Russian Federation Vladimir Putin, as well as their harmonious interaction. Turkey and Russia, along with all stakeholders, are working together on this project as a unified team.”

 

He stated further that, “the year 2024 was not only a year of serious challenges for Akkuyu NPP, but also of great achievements.

 

“Today, we witnessed one of the key events at the site – the completion of turbine installation. This is a necessary step on the long road to the launch of the power unit. We are committed to making every effort to ensure that Turkey’s first nuclear power unit begins operation in the near future, providing millions of consumers with stable, low-carbon energy.”

 

RELATED NEWS

UK Summons Senior Iranian Diplomat Over Stabbing Of Journalist In London

Japan’s Middle East Oil Supply Set To Rebound As More Tankers Exit Hormuz

Bomb Attack Rocks Damascus During Macron Visit, 18 Injured

Sergei Butckikh, Chief Executive Officer of Akkuyu Nuclear JSC, made a report on the main stages of the project implementation in 2024 during the event, he provided a detailed overview of the commissioning work at Unit 1, readiness stage of auxiliary facilities, major construction and installation operations and plans for the upcoming year. Sergei Butckikh also reported the successful completion of a key operation in the turbine hall of Unit 1: the installation of the turbine-generating unit on the shaft-turning gear.

 

This year, a number of key operations were carried out, most notably the start of full-scale commissioning at Unit 1.

 

“All main equipment of the reactor unit has been installed in the reactor compartment, and preparations for pre-launch tests with loading of nuclear fuel simulators are actively underway.”

 

He noted that the turbine assembly was successfully completed, i.e. a set of sequential operations that ended with the key event of placing the turbine-generating unit on the shaft-turning gear. The turbine shaft began rotating at low speeds for the first time. The experts thoroughly checked the correct alignment of all elements and confirmed the high quality of the turbine unit assembly.

 

Butckikh explained that the successful completion of the operation demonstrates the high technical readiness of the turbine and auxiliary systems for the next key stage of the unit’s commissioning – cold-and-hot run-in of the reactor unit.

 

The NPP turbine is a high-power thermal rotary motor. The cylinder rotor is known to be one of the key components of the motor. Superheated steam produced from desalinated water in the reactor facility’s steam generators is delivered to the rotor blades under high pressure. The energy of the compressed and heated steam enables the rotor to spin, converting it into mechanical energy, which is transferred to the turbine generator that produces electric current.

At the forthcoming stage, a set of pre-launch tests, including tests of the sealed enclosures system and safety systems, will be carried out in the turbine hall of Akkuyu NPP Unit 1. After that, the turbine will be ready for comprehensive pre-launch operations.

The Akkuyu NPP project includes four power units equipped with Generation 3+ VVER reactors of Russian design. The capacity of each power unit will be 1200 MW. Akkuyu NPP is the first project in the global nuclear industry being implemented according to the Build-Own-Operate model.

Russia is actively developing scientific cooperation with all interested countries. The implementation of major international projects also continues. Rosatom and its divisions take an active part in this work.

We’ve got the edge. Get real-time reports, breaking scoops, and exclusive angles delivered straight to your phone. Don’t settle for stale news. Join LEADERSHIP NEWS on WhatsApp for 24/7 updates →

Join Our WhatsApp Channel

LEADERSHIP News

LEADERSHIP News

OTHER NEWS UPDATES

Foreign News

UK Summons Senior Iranian Diplomat Over Stabbing Of Journalist In London

13 hours ago
Japan’s Middle East Oil Supply Set To Rebound As More Tankers Exit Hormuz
Foreign News

Japan’s Middle East Oil Supply Set To Rebound As More Tankers Exit Hormuz

13 hours ago
Bomb Attack Rocks Damascus During Macron Visit, 18 Injured
Foreign News

Bomb Attack Rocks Damascus During Macron Visit, 18 Injured

13 hours ago
Next Post
Much Ado About Tax Reforms

No Going Back On Tax Reforms, Tinubu Declares

Advertisement

LATEST UPDATE

FIFA Investigates Alleged Racist Abuse of Streamer IShowSpeed

44 seconds ago

NCC Enlists Students in Campaign to Protect National Telecom Assets

11 minutes ago

Nigerian-American Ugo Ugochukwu Dominates British GP Sprint, Claims Second F3 Win Of Season

15 minutes ago

Airtime Lending’ Restarts After Regulator Suspends Enforcement

17 minutes ago

Guinness World Records Certifies King Saheed Osupa and KS1 Malaika’s Afrobeats Orchestra Achievement

19 minutes ago
Load More
Advertisement
Facebook Twitter Instagram Youtube Whatsapp

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino.