• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Saturday, July 5, 2025
Leadership Newspapers
Read in Hausa
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

Federal Govt Begins Transmission, Substations Project In Ekiti, To Add 204MW

by Nse Anthony - Uko
3 years ago
in Business
Share on WhatsAppShare on FacebookShare on XTelegram

The federal government has begun the construction of a 132 kilovolts transmission line and a 2 by 60MVA transmission substation and a switching station in Ekiti state to raise the state’s capacity by 204 megawatts (MW).

Advertisement

Minister of Power, Engr. Abubakar Aliyu, made this known during the groundbreaking ceremony in Ado Ekiti yesterday, said the project consists of a 50 kilometre stretch of 132kV transmission line from Ikere (Ado Ekiti) with a turn in – turn out at Ijesa Isu that terminates at Ilupeju Ekiti, according to to a statement by general manager, Public Affairs, TCN, Mrs Ndidi Mbah.

It also has a 2X60MVA, 132/33kV transmission substation with four line bays at Ijesa Isu Ekiti with a switching station at Ikere (Ado Ekiti) in the state.

The Minister who was represented by the managing director and CEO of the Transmission Company of Nigeria, TCN, Engr. Sule Ahmed Abdulaziz, said: “For TCN, this is a very strategic project and we believe it will have a massive impact on bulk power transmission in Ekiti and environs.

“The projects are part of the many projects being undertaken by the Transmission Company of Nigeria in pursuit of its grid expansion programme which is in line with Mr. President’s mandate for the expansion of the Power Sector for sustainable development.”

RELATED

Nigeria’s Internet Subscribers Reach 148m, Highest In 14 Months

Despite 50% Tariff Hike, Internet Usage Hits 1m TB In May

54 minutes ago
Equities To Sustain Positive Sentiment Amidst Audited Earnings Expectations

Interim Dividend: Stocks Gain N377bn In 1 Week

55 minutes ago

The minister said in various transmission regions, nationwide, TCN is equally executing substations and lines projects which are all at various stages of execution.

“These are a clear indication that the federal government is not relenting in its determination to ensure that the nation’s power sector receives the desired boost.

For the residents of Ekiti state and its environs, the additional 204 megawatts capacity to the grid means that more bulk supply will be readily available for offtake by Benin DisCo for its customers in Ekiti and environs,” he noted.

The substations’ project also will take care of suppressed load in this axis and relieve the Ado-Ekiti substation which has been overburdened to ensure a more reliable electricity supply to the people of Ekiti, he added.

The Minister also called on Ekiti residents to support the government efforts against vandalism of power facilities, saying, “We must demonstrate our collective responsibility toward preserving the nation’s power equipment in and around our communities so that the government can concentrate on its grid expansion initiative instead of wasting funds replacing vandalized power infrastructure.”

In his remarks, the governor of Ekiti state, Kayode Fayemi said, the state receives just only 26 megawatts of electricity from the national grid.

“This level of electricity supply is worrisome and grossly inadequate going by the energy need of our population, estimated to be around 150 megawatts in 2014. Beyond this intolerable level, the quality of the electricity supply is grossly below standard due to non-availability of adequate 132/33KV transmission line and the associated equipment that can help improve the quality of power to be delivered to our people, especially those in the Interior and the rural areas,” stated Fayemi, represented by his deputy.

The governor said although, the project is one of the federal government awarded contracts, “for us as a state, the project, when completed will complement the plans of the Ekiti state government at improving the quality of energy supply to the 16 local government areas of the state.”

 

 


We’ve got the edge. Get real-time reports, breaking scoops, and exclusive angles delivered straight to your phone. Don’t settle for stale news. Join LEADERSHIP NEWS on WhatsApp for 24/7 updates →

Join Our WhatsApp Channel

BREAKING NEWS: Nigerians can now earn US Dollars from the comfort of their homes with Ultra-Premium domains, acquire them for as low as $1700 and profit as much as $25,000. Click here to learn how you can earn US Dollars consistently.


SendShareTweetShare
Previous Post

Zamfara: 2nd Republic Lawmaker Canvasses Support For Obi

Next Post

BREAKING: Buhari Meets Families Of Kidnapped Kaduna Train Passengers

Nse Anthony - Uko

Nse Anthony - Uko

You May Like

Nigeria’s Internet Subscribers Reach 148m, Highest In 14 Months
Business

Despite 50% Tariff Hike, Internet Usage Hits 1m TB In May

2025/07/05
Equities To Sustain Positive Sentiment Amidst Audited Earnings Expectations
Business

Interim Dividend: Stocks Gain N377bn In 1 Week

2025/07/05
Nigeria Is Top Investment Pick, Says Asia Fund Veteran
Business

Nigeria Is Top Investment Pick, Says Asia Fund Veteran

2025/07/05
Galaxy Backbone, REA Partner To Power Rural Areas
Business

Galaxy Backbone, REA Partner To Power Rural Areas

2025/07/05
Press Release – Response To Allegations Against Segilola Resources Operating Limited By Osun State Gov’t
Business

Segilola Resources Unveils Livelihood Programme For Osun Communities

2025/07/05
Surge In Cost Of Building Materials, Escalating House Rents
Business

Housing Ministry Holds Retreat On Performance Contract Signing

2025/07/05
Leadership Conference advertisement

LATEST

WAFCON 2024: Oshoala Target 10th Title With Super Falcons

Gbolabo Adebakin: Championing Nigeria’s Gastronomic Future

Defection: Akwa Ibom Speaker Reshuffles Assembly Leadership

Ministry Confirms Outbreak Of Dengue Fever In Edo

Poor Investment In Education Responsible For Development Setbacks – Obi

Delta Students Win ‘Debate Competition’ ln Qatar

Opposition Has Acknowledged Our Performance – Gov Otti

Ohanaeze Not Interested In Partisan Politics – Spokesman

SDP Inaugurates Disciplinary Committee

Gov. Yahaya Leads Delegation On Condolence Visit To Dantata Family

© 2025 Leadership Media Group - All Rights Reserved.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2025 Leadership Media Group - All Rights Reserved.