• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Thursday, June 4, 2026
Leadership Newspapers
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
Hausa Edition
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

Federal Govt Begins Transmission, Substations Project In Ekiti, To Add 204MW

Nse Anthony-Uko by Nse Anthony-Uko
4 years ago
in Business
Electricity Distribution
Share on WhatsAppShare on FacebookShare on XTelegram

The federal government has begun the construction of a 132 kilovolts transmission line and a 2 by 60MVA transmission substation and a switching station in Ekiti state to raise the state’s capacity by 204 megawatts (MW).

Minister of Power, Engr. Abubakar Aliyu, made this known during the groundbreaking ceremony in Ado Ekiti yesterday, said the project consists of a 50 kilometre stretch of 132kV transmission line from Ikere (Ado Ekiti) with a turn in – turn out at Ijesa Isu that terminates at Ilupeju Ekiti, according to to a statement by general manager, Public Affairs, TCN, Mrs Ndidi Mbah.

It also has a 2X60MVA, 132/33kV transmission substation with four line bays at Ijesa Isu Ekiti with a switching station at Ikere (Ado Ekiti) in the state.

The Minister who was represented by the managing director and CEO of the Transmission Company of Nigeria, TCN, Engr. Sule Ahmed Abdulaziz, said: “For TCN, this is a very strategic project and we believe it will have a massive impact on bulk power transmission in Ekiti and environs.

“The projects are part of the many projects being undertaken by the Transmission Company of Nigeria in pursuit of its grid expansion programme which is in line with Mr. President’s mandate for the expansion of the Power Sector for sustainable development.”

The minister said in various transmission regions, nationwide, TCN is equally executing substations and lines projects which are all at various stages of execution.

“These are a clear indication that the federal government is not relenting in its determination to ensure that the nation’s power sector receives the desired boost.

For the residents of Ekiti state and its environs, the additional 204 megawatts capacity to the grid means that more bulk supply will be readily available for offtake by Benin DisCo for its customers in Ekiti and environs,” he noted.

The substations’ project also will take care of suppressed load in this axis and relieve the Ado-Ekiti substation which has been overburdened to ensure a more reliable electricity supply to the people of Ekiti, he added.

The Minister also called on Ekiti residents to support the government efforts against vandalism of power facilities, saying, “We must demonstrate our collective responsibility toward preserving the nation’s power equipment in and around our communities so that the government can concentrate on its grid expansion initiative instead of wasting funds replacing vandalized power infrastructure.”

In his remarks, the governor of Ekiti state, Kayode Fayemi said, the state receives just only 26 megawatts of electricity from the national grid.

RELATED NEWS

Nigerians Can Now Sell Excess Solar Power To National Grid – NERC

NUPRC Opens 2026 Licensing Round in Q3 Amid Investors’ Confidence

Nigeria’s Power Sector Needs Credit Ratings To Attract Long-Term Investment – Report

“This level of electricity supply is worrisome and grossly inadequate going by the energy need of our population, estimated to be around 150 megawatts in 2014. Beyond this intolerable level, the quality of the electricity supply is grossly below standard due to non-availability of adequate 132/33KV transmission line and the associated equipment that can help improve the quality of power to be delivered to our people, especially those in the Interior and the rural areas,” stated Fayemi, represented by his deputy.

The governor said although, the project is one of the federal government awarded contracts, “for us as a state, the project, when completed will complement the plans of the Ekiti state government at improving the quality of energy supply to the 16 local government areas of the state.”

 

 

We’ve got the edge. Get real-time reports, breaking scoops, and exclusive angles delivered straight to your phone. Don’t settle for stale news. Join LEADERSHIP NEWS on WhatsApp for 24/7 updates →

Join Our WhatsApp Channel

Nse Anthony-Uko

Nse Anthony-Uko

Nse Anthony-Uko is a business and financial journalist with over two decades of experience covering Nigeria's financial system, economy, energy sector, corporate landscape, and global economic developments. Her expertise blends frontline journalism with editorial leadership and a strong grasp of financial market dynamics. She has earned multiple professional recognitions and was selected for the International Visitors Leadership Programme (IVLP) in the United States.

OTHER NEWS UPDATES

NERC Partners Orientation Agency To Sensitise Electricity Consumers
Business

Nigerians Can Now Sell Excess Solar Power To National Grid – NERC

2 hours ago
NUPRC Opens 2026 Licensing Round in Q3 Amid Investors’ Confidence
Business

NUPRC Opens 2026 Licensing Round in Q3 Amid Investors’ Confidence

9 hours ago
Geometric Power, ASERA Commended For Sustainable Electricity Supply, Regulatory Reforms
Business

Nigeria’s Power Sector Needs Credit Ratings To Attract Long-Term Investment – Report

9 hours ago
Next Post
Buhari

BREAKING: Buhari Meets Families Of Kidnapped Kaduna Train Passengers

Advertisement

LATEST UPDATE

Man Dies In Kano Retrieving Phone From Well

2 minutes ago

AIG Counsels Police Officers On Vigilance, Professionalism

3 minutes ago

Insecurity Forced Closure Of 10 Churches In Katsina Communities – Cleric

3 minutes ago

NDIC Sensitises Kaduna Students To Financial Literacy

5 minutes ago

Police Uncover Gun Factory, Arrest 7 Suspects In Yobe

7 minutes ago
Load More
Advertisement
Facebook Twitter Instagram Youtube Whatsapp

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino.