• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Monday, October 26, 2026
Leadership Newspapers
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
Hausa Edition
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

Oilserv Targets December Completion Of 303km As AKK Pipeline Crosses River Niger

LEADERSHIP News by LEADERSHIP News
1 year ago
in Business
Oilserv Limited
Share on WhatsAppShare on FacebookShare on XTelegram

Oilserv Limited, one of the three contractors handling the Ajaokuta-Kaduna-Kano (AKK) gas pipeline project, has announced a major milestone in its 303 kilometres section of the pipeline by successfully crossing the River Niger using advanced Horizontal Directional Drilling (HDD) technology.

The company is targeting mechanical completion of its segment by the end of 2025.

The AKK pipeline, a flagship project executed by the Nigerian National Petroleum Company Limited (NNPC Ltd.), spans a total length of 614 kilometres.

Designed to transport natural gas from Ajaokuta through Kaduna and Abuja to Kano, the pipeline aims to boost power generation, industrialisation, and residential gas supply across Nigeria’s northern corridor.
Group chief executive officer of Oilserv Limited, Dr. Emeka Okwuosa, revealed the successful crossing during a briefing with journalists in Abuja on Friday. He described the River Niger crossing as the most significant challenge in the project due to the river’s vast width—over two kilometers at the crossing point—and the environmental sensitivity of the area.

“To cross the River Niger without disturbing the water or the environment required us to employ Horizontal Directional Drilling, a trenchless technology that allows us to bore underground through consolidated formations,” Dr. Okwuosa explained.

RELATED NEWS

Safety Concerns Grow As NCAA Halts Critical Training For Aviation Workers

FCMB Injects N364.6bn Into Agriculture, Supports 196,000 Farmers

Weak Economic Data, Rating Concerns Keep Nigeria’s Borrowing Costs High – Oyedele

“This method is similar in concept to the Channel Tunnel connecting England and France, where a curved underground path is created to avoid surface disruption.”

The HDD technique involves launching a drilling rig from the surface to create a curved underground tunnel through which the pipeline is installed. This approach minimizes environmental impact and avoids disturbing the riverbed, making it ideal for the sensitive ecosystem of the Niger River.

Oilserv’s 303-kilometre stretch covers the pipeline from Ajaokuta to the border between Kaduna State and Niger State, roughly half of the entire AKK pipeline length. The terrain along this route is notably challenging, featuring thick jungles, rocky outcrops, multiple river crossings, hills, cliffs, and busy roadways, including dual carriageways.

“The terrain is tough, especially around Kogi State where we have to blast through rock to lay the pipeline,” said Dr. Okwuosa. “Crossing roads and highways without disrupting traffic requires precise drilling techniques. Each obstacle demands careful planning and engineering excellence.”

Security concerns, flooding, and logistical complexities—such as transporting large pipeline sections from the port to remote locations—have also posed significant hurdles. Despite these challenges, Oilserv has maintained steady progress, attributing its success to close collaboration with NNPC Ltd. and robust project management.

Dr. Okwuosa emphasised that the company’s local expertise and experience are critical to the project’s success.

“This project is a testament to Nigerian engineering capability. There is no other indigenous company of our size and capacity that can handle a project of this magnitude,” he said.

Funding for the AKK pipeline has been a key concern, but NNPC Ltd. has successfully navigated financial challenges with support from Afreximbank.

According to him, Oilserv raises capital to execute project milestones and invoices NNPC for payments, ensuring smooth cash flow and continuity.

He noted that with the support from the Afreximbank and Fidelity Bank, Oilserv raises the money, achieves the milestone, puts in its bill/invoice while the NNPC pays.

Dr. Okwuosa confirmed that the company is on track to achieve mechanical completion of its 303-kilometer segment by December 2025, a critical step toward the overall pipeline’s operational readiness.

The AKK pipeline is a cornerstone of Nigeria’s Gas Master Plan, aimed at harnessing the country’s vast natural gas resources to drive economic growth. By connecting gas supply from the resource-rich Ajaokuta region to northern industrial hubs and residential areas, the pipeline will support power generation, reduce energy costs, and encourage industrial development.

We’ve got the edge. Get real-time reports, breaking scoops, and exclusive angles delivered straight to your phone. Don’t settle for stale news. Join LEADERSHIP NEWS on WhatsApp for 24/7 updates →

Join Our WhatsApp Channel

BREAKING NEWS: Nigerians can invest ₦2.5million on premium domains and earn about ₦17-25Million. Earnings in USD. Rather than wonder, click here to find out how it works

LEADERSHIP News

LEADERSHIP News

OTHER NEWS UPDATES

Safety Concerns Grow As NCAA Halts Critical Training For Aviation Workers
Business

Safety Concerns Grow As NCAA Halts Critical Training For Aviation Workers

2 hours ago
FCMB Backs Healthcare Sector Development With Financing Tools
Business

FCMB Injects N364.6bn Into Agriculture, Supports 196,000 Farmers

2 hours ago
New Tax Policy To Exempt 95% of Informal Sector — Oyedele
Business

Weak Economic Data, Rating Concerns Keep Nigeria’s Borrowing Costs High – Oyedele

2 hours ago
Next Post
Group To Drive Africa’s Tech-led Industrial Revolution, Offers Tips To Unlock $450bn Intra-African Trade

Group To Drive Africa’s Tech-led Industrial Revolution, Offers Tips To Unlock $450bn Intra-African Trade

LATEST UPDATE

Nigerians Demand Probe Over Viral Video of Boys Chanting Threats Against Christians

33 minutes ago

‘APC-Led Administration Funding Politicians’ Lavish Lifestyles’, NDC Slams APC Over ₦100m SUVs

35 minutes ago

Tinubu’s Government Not Transparent About Its Handling Of The Ebola Situation – Adebayo

35 minutes ago

Kano NDC Threatens To Sue INEC Over Gwarzo’s Exclusion

47 minutes ago

BREAKING: Ebola Patient Evacuated From Nigeria Via Air Ambulance

1 hour ago

20,000 Volunteers Join Igboho’s Iru Ekun Security Network In Oyo

1 hour ago

UniAbuja Postgraduate Students Pledge Support For Tinubu, Others

2 hours ago

Philippine Authorities Investigate Child Pornography Material Found At Thomas Markle’s Home

2 hours ago

Woman Loses $10,000 In AI-Powered Jon Bon Jovi Romance Scam Traced To Lagos

2 hours ago

YOSADAC DG Meets UNODC Chief On Drug Abuse Control, Others

2 hours ago
Load More
Facebook Twitter Instagram Youtube Whatsapp

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino | Polskie Kasyno.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
    • Football
  • Health
  • Entertainment
  • Education
  • Opinion
    • Editorial
    • Columns
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2026 LEADERSHIP Media Group - All Rights Reserved | Hausa | Online Casino | Polskie Kasyno.