• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Monday, July 14, 2025
Leadership Newspapers
Read in Hausa
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

Gbarain Power Plant Operational Soon – NDPHC

by Nse Anthony - Uko
1 year ago
in Business
Gbarain
Share on WhatsAppShare on FacebookShare on XTelegram

The managing director of Niger Delta Power Holding Company (NDPHC), Chiedu Ugbo on Tuesday gave the assurance that the Gbarain Power Plant will soon become operational.
Addressing members of the House of Representatives Committee on Power who were on an oversight visit to the plant that cash flow constraint was the major issue that delayed the resuscitation of the Power Control Module that got burnt.

Advertisement

According to him, when he came on board in 2016, Gbarain Power Plant was still a construction site.
“We had to put a unit to the grid and unfortunately the temporary power control module put in place got burnt. But at the time it happened, we had a more pressing threat to the community which was the line pipe laid before 2015 was being washed away by River Nun.

“It got to a point when the pipeline was dangling on top of the river and no responsible management will ignore such a tremendous threat to the host community.

We shut down the plant, made sure we fix that pipeline by doing a horizontal direction by burying it many metres away. We couldn’t take the two capital intensive projects together because of our financial limitations. Right now, we are owed close to N200 billion forever because as NBET is paying, it is accumulating more.

Right now, we have completed the line pipe project, and the entire community is now safe. It is now time to confront the PCM issues and we have informed the original equipment manufacturer, Scheider, we have done the procurement but to fast-track the resuscitation of Gbarain, we are moving one from one of our sites and replacing it with the one that will be purchased.

RELATED

Maximize Your Profits With BYDFi’s Trading Bots For Bitcoin, Ethereum, and Ripple

Maximize Your Profits With BYDFi’s Trading Bots For Bitcoin, Ethereum, and Ripple

13 hours ago
Dangote Refinery

Labour, Experts Back Dangote, Say Govt Refineries May Never Work

14 hours ago

However, all the engineering and gas assets are well preserved, and the plant is obviously well maintained. It was just coincidental that the resolution was tabled otherwise, we were already well on the way to fixing the problem.

On the date that the PCM would be fixed, Ugbo said the being an engineering issue, it will be difficult to mention a particular date immediately. To assure the member representing Yenagoa, Okpokuma federal constituency, Ofoji that our team will sit with representatives of Bayelsa State Government and agree on timelines to bring the equipment and install it.

This was the first site I visited after I resumed as managing director. There was a procurement for reinforcement of the 1.5 kilometre gas pipeline from Shell facility to this place. It was on the bank of River Nun.


We’ve got the edge. Get real-time reports, breaking scoops, and exclusive angles delivered straight to your phone. Don’t settle for stale news. Join LEADERSHIP NEWS on WhatsApp for 24/7 updates →

Join Our WhatsApp Channel



Tags: NDPHC
SendShareTweetShare
Previous Post

Wema Bank Launches Digital Solution For Cooperative Societies

Next Post

FG Targets Rice, Maize, Others, For Year-round Cropping

Nse Anthony - Uko

Nse Anthony - Uko

You May Like

Maximize Your Profits With BYDFi’s Trading Bots For Bitcoin, Ethereum, and Ripple
Business

Maximize Your Profits With BYDFi’s Trading Bots For Bitcoin, Ethereum, and Ripple

2025/07/14
Dangote Refinery
Business

Labour, Experts Back Dangote, Say Govt Refineries May Never Work

2025/07/14
Africa Creates Job Clusters With Enhanced Gas Penetration
Business

$25bn Nigeria-Morocco Gas Pipeline Project Implementation Advances Further

2025/07/14
FAAN Reopens Port Harcourt Airport Runway For Flight Operations After Air Peace Mishap
Business

FAAN Reopens Port Harcourt Airport Runway For Flight Operations After Air Peace Mishap

2025/07/14
NCAA Digitises Operations For AOC, Licence Renewal
Business

Absence Of Board In NCAA, NAMA Threatens Safety, Fuel Job Racketeering

2025/07/14
Nigeria Needs 72 Edge Data Centres To Compete Globally – Nnamani
Business

$242.72bn At Risk As Data Centres Face Escalating Climate Threats

2025/07/14
Leadership Conference advertisement

LATEST

FULL LIST: Tinubu Appoints Akume, Wike, Ribadu, Others To C’ttee For Buhari’s State Funeral

Buhari Was A Spartan Soul In A Sea Of Extravagance — Aliyu Audu

PICTORIAL: Osinbajo, Dangote, Others Bid Awujale Farewell

‘Buhari Stood Firm When It Was Easier To Bend,’ Says Ex-SGF Boss Mustapha

PIA: Nigeria Must Win Battle Against $79.4m Daily Oil Theft — Kalu

Osimhen Close To Joining Galatasaray On Permanent Deal

King Of Morocco Pays Tribute To Buhari, Consoles Nigeria

Jonathan, Akufo-Addo Visit VP Shettima In London, Pay Tribute To Late President Buhari

Dafinone Hails Obaigbena As Nigerian Media Icon At 66

Buhari: Don’t Speak Ill Of The Dead, Shehu Sani Cautions Nigerians

© 2025 Leadership Media Group - All Rights Reserved.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2025 Leadership Media Group - All Rights Reserved.