• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Wednesday, May 14, 2025
Leadership Newspapers
Read in Hausa
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

NDPHC, Partners Turn Sod For Light Up Agbara Project

by Nse Anthony - Uko
12 months ago
in Business
NDPHC
Share on WhatsAppShare on FacebookShare on XTelegram

The Niger Delta Power Holding Company and its partners as well as other stakeholders in the electricity industry have performed the groundbreaking of the Light Up Agbara project.

Advertisement

Vice President Kashim Shettima, who performed the ceremony, noted that NDPHC is the catalyst as far as the provision of electricity is concerned in the country. The groundbreaking ceremony was held within the premises of Evans Baroque on Thursday.

The VP who was represented by the managing director of NDPHC  Chiedu Ugbo, noted that the Nigerian Federation has invested so much in the NDPHC to the extent that it has 4,000 megawatts generation capacity built with people’s funds but it is grossly underutilised due to a number of factors outside NDPHC’s control.

He  narrated that despite the huge investment in the power sector and Nigerians were still not getting the most benefit, NDPHC decided to take the lead by coming up  with the idea of Light Up Nigeria by rallying everybody in the industry together.

“For many years, worried about what we can do to salvage the situation. I have been working with Transmission Company of Nigeria (TCN) and then a few years ago, we started partnering with Eko DisCo. We did a bilateral agreement and then we signed the framework agreement and I insisted that we must go to Agbara, being the industrial cluster in sub-Saharan Africa to salvage the situation. We must provide electricity to industrial areas.

RELATED

Fidson Invests ₦3.7bn To Boost Local Pharma Production In 2024

Fidson Invests ₦3.7bn To Boost Local Pharma Production In 2024

5 hours ago
NRC Suspends Rail Services ln Delta

Vandalism: NRC Averts Train Accident Along Warri-Itakpe Railway Corridor

8 hours ago

“What the sector needs is the synergy by every stakeholder from gas through generation, through transmission, through distribution to end users. For us, the issue is to seek out the load centres like Agbara.

Agbara is a pilot for the Light Up Nigeria Initiative. We brought the Vice President here, who himself is leading this charge on behalf of the President to ensure that we energise businesses to enable industrial growth.”

According to him, Eko DisCo was brought into the Agbara scheme because it is the owner of this franchise area while NDPHC is a generation company. “For our electricity to be dispatched, there must be demand and it is that demand that we are working on. That demand has to be facilitated by effective electricity transportation and that is why we brought in TCN and that is why we have FGN power Company to unlock the bottlenecks in the transmission.

“That is why we are here today. The FGN power has taken the first step by bringing the mobile transformer to install and that is why we are having the groundbreaking today.

 

We are also working with our distribution contractors who will do the reticulation together with Millwater to the various customers.

 

Giving an update on the Light Up Nigeria project, NDPHC executive director, Corporate Services, Nkechi Mba disclosed that aside Agbara, the company was also working assiduously to light other parts of Nigeria and has so far launched the light Up South East version with Vice President Kashim Shettima leading the charge.

 

The North East version of the project, she explained, will be launched in Bauchi next month.

 

Mba urged stakeholders in Agbara industrial cluster to bear with the delay in completing the project on schedule, explaining that it was due to certain unforeseen circumstances arising from the novelty of the project.

 

She also commended FGN Power Company for generously providing the mobile transformer that was

 

inaugurated.

 

And that we are at this stage today is because the Chairman of our Board, Vice President Kashim Shettima is bringing his influence to bear on this Initiative. Agbara will soon be replicated across Nigeria. After Bauchi and Kano, we plan to be in Port Harcourt.

 

Also speaking on the capacity of NDPHC to make the Light Up Nigeria a reality, NDPHC executive director, Generation Kassim Abdulahi declared that NDPHC had more than enough capacity to meet up with every obligation of the initiative.

 

“We have enough available power in all our power plants. We have almost 3,000MW ready to go but we are currently dispatching less than 1,000MW”, he disclosed.


We’ve got the edge. Get real-time reports, breaking scoops, and exclusive angles delivered straight to your phone. Don’t settle for stale news. Join LEADERSHIP NEWS on WhatsApp for 24/7 updates →

Join Our WhatsApp Channel



Tags: NDPHC
SendShareTweetShare
Previous Post

Port Congestion Looms Over Continued Closure Of Apapa Bridge, Terminal Operators Warn

Next Post

FG Sign MOU With NESG To Drive Growth In Creative Sector

Nse Anthony - Uko

Nse Anthony - Uko

You May Like

Fidson Invests ₦3.7bn To Boost Local Pharma Production In 2024
Business

Fidson Invests ₦3.7bn To Boost Local Pharma Production In 2024

2025/05/14
NRC Suspends Rail Services ln Delta
Business

Vandalism: NRC Averts Train Accident Along Warri-Itakpe Railway Corridor

2025/05/14
External Reserves Dip 6.5% YTD On Debt Servicing, Dollar Sales
Business

External Reserves Dip 6.5% YTD On Debt Servicing, Dollar Sales

2025/05/14
CBN Reassures Public On Bank Deposit Safety, Dismisses Licence Revocation Fears
Business

CBN Unveils Non-resident BVN Platform, Targets $1bn Monthly Diaspora Remittance

2025/05/14
Business

Poor Infrastructure Affecting Tax Compliance – Market Groups

2025/05/14
NAICOM Mandates Insurers To Upload Additional Documents For Post Placement Report
Business

NAICOM Launches Revised Insurance Regulation For Leased Aircraft

2025/05/14
Leadership Conference advertisement

LATEST

SMEDAN Unveils ‘GROW Nigerian Plan’ To Boost MSME Growth

Abdominal Injury: Kwara Gov Wishes Football Star Taiwo Awoniyi Quick Recovery

Nollywood Producers Join Global Effort To Tackle Digital Copyright Theft

Borno Gov’t Moves To Rehabilitate 73 Minors Indulged In Drug Abuse, Crime

Court Adjourns Suit On Naira Abuse Against TikToker Murja Kunya

PFN President Seeks God’s Intervention To Address Economic, Insecurity Challenges

Federal Gov’t To Partner NASS, Media, Others On Review Of Cybercrime Act

FedPoly Bauchi Gets Full NBTE Accreditation, Approval For HND In AI, 7 New Courses

Senate Denies Allegations Linking Viral Romantic Video To Serving Senator

Rivers CP Links Rise In Kidnapping Cases To Reduced Illegal Bunkering

© 2025 Leadership Media Group - All Rights Reserved.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2025 Leadership Media Group - All Rights Reserved.