• Hausa Edition
  • Podcast
  • Conferences
  • LeVogue Magazine
  • Business News
  • Print Advert Rates
  • Online Advert Rates
  • Contact Us
Wednesday, September 10, 2025
Leadership Newspapers
Read in Hausa
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us
No Result
View All Result
Leadership Newspapers
No Result
View All Result

Federal Govt Okays N6bn For 3rd Mainland Bridge Maintenance

...N17bn for old Enugu-Onitsha road contract review

by Jonathan Nda-Isaiah
2 years ago
in Business
Reading Time: 4 mins read
3rd Mainland Bridge
Share on WhatsAppShare on FacebookShare on XTelegram

The federal government has approved N6.28 billion for surface maintenance of the Third Mainland Bridge, Lagos State.

Advertisement

Minister of Works and Housing, Babatunde Fashola, disclosed this to State House correspondents on Wednesday after the federal executive council meeting presided over by vice president, Yemi Osinbajo at the Presidential Villa .

According to him, the maintenance of third mainland bridge would take 24-months and will cover 11 kilometers including interchanges, ramps, and critical links.

He said the move aligns with Executive Order 11 signed by President Muhammadu Buhari, in April 2022, which gave legal backing to the country’s national maintenance policy.

The minister said there will be no duplication of efforts by the federal government or State government who have also began maintenance on some sections of the bridge.

According to him, the State’s Public Works Corporation will focus on the functional structure of the bridge such as the underwater piles, while the federal government will undertake surface maintenance to treat potholes and restore missing guard rails.

He also said Council approved a N17.5 billion variation for the contract for the construction of the old Enugu-Onitsha road whose current sum now stands at N48.99bn.

He said, “We presented two memoranda to council and both were approved. The first was with regard to contract cost revision by way of augmentation for the old Enugu/Onitsha Road, from Okpi Junction, all the way to Udioji to Anambra border in Enugu state.

“The augmentation was in the sum of N17,050,000,000, which revised the contract to N48,996,488,925 Naira with an additional completion time of 42 months.

“The second contract was a fresh contract for the maintenance of the pavement of the Third Mainland Bridge and this was approved in the sum of N6,278,063,585.58 for a period of 24 months. This is in consonance with the Executive Order 11 signed by Mr. President for the continued maintenance of public infrastructure.

RELATED

Apple To Launch iPhone 17 With Enhanced AI Features

Apple To Launch iPhone 17 With Enhanced AI Features

13 hours ago
Nigeria’s Textile Import Bill Rises By 100.3% To N365.5bn

Manufacturing, Agric Sectors’ Underperformance Weakens Industrialisation

19 hours ago

“Now, some of you might ask, I was asked before that, okay, we did some work on Third Mainland Bridge before, why were there potholes now on it? So, this contract is in response to the potholes that have become manifest on the entire pavement of the deck of the bridge, spanning 11 kilometers and the interchanges at Adeniji Adele, Adekunle, and Gbagada ramps that all link the bridge.

“This is for the resurfacing and all of that. Those who are familiar with the bridge will recall that all of these failings were not this manifest on the bridge at the time we were doing the work we were doing. The work that we did concentrated largely on the sub-structure of the bridge, the piles, the underwater piles, the pile caps, and also the replacement of the expansion joint and the bearings. These are maintenance works that are critical to the structural integrity of the bridge.

“What we’re dealing with now is different. It is the driving surface and the aesthetics, some of the rails that have been stolen, some of the planes that are misaligned at ramps that lead you on and off the bridge. So, this is the work that is being done now. So, all the experience of avoiding potholes on the bridge, this award of contract will tackle that.”

Asked if there are cameras to man bridges and other places, he said, “Currently , what exist are some levels of manual patrols. And these are some of the debates that we had in Council today. How, by legislation, such as the Federal Road Safety Commission Act, the law enforcement and securing of federal highways have been taken away from the Ministry of Works and vested in Federal Road Safety Corps, which is now domiciled in the Office of the Secretary to the Government of the Federation (OSGF) under the Presidency. So, there is need to realign those ministerial oversights.

“One of my proposals today for consideration and recommendation to the next government is to move the Federal Road Safety Corps away from the SGF and let it become a parastatal supervised by the Ministry of Works, whoever that may be, so that there is a proper alignment of responsibility because if you build the road, somebody has statutory responsibility to secure it.

“That person better reports to the main organ instead of through a third or remote organisation. But one of the things you might find also is as fibre optic capacity increases, then it will be easier to install cameras because cameras need remote monitoring to carry images and I know that Lagos State is rolling out very, very massively in terms of fiber optic. So, I think we will get there sooner rather than later.”

Fielding question on whether there be closure or shutdown of the bridge during the 24 months repairs will be going on, the minister said when the formal contracts are drawn same contractors mobilised to site, they will work with the Lagos state government.

“We have a close working relationship with the government and also with their agencies. We do a lot of communication to the commuting public in Lagos using national and state agencies especially the Lagos Traffic Radio. I am not able to say categorically now, what the methods statement would be in terms of closures or no closures. I can reasonably anticipate diversions and some traffic management.

“But what we try to do is to ensure that since it is scarifying largely and resurfacing, it can be done over weekend, wherever there is the need to have unimpeded work area. We’ve tried that before. We close down on Fridays and reopen early Monday.

“I think that will be the worst that we will see in sections but not for any prolonged period. So, we will try and minimize the discomfort to commuters as much as possible and as much as it is avoidable, through management, planning, preparation and communication.

“Those are the tools of management. To prepare and work with the contractor and see what he wants to do. They will communicate and notify the public that there will be disruptions or diversions and we will monitor and implement very diligently as we have done before.”

 

Join Our WhatsApp Channel

SendShare10180Tweet6362Share
ADVERTISEMENT
Previous Post

Federal Govt, States Spent N50bn From N400bn Approved For Poverty Reduction – Gov Sule

Next Post

‘Violation Of Public Contract Laws Costs Nigeria $10bn Yearly’

Jonathan Nda-Isaiah

Jonathan Nda-Isaiah

You May Like

Apple To Launch iPhone 17 With Enhanced AI Features
Business

Apple To Launch iPhone 17 With Enhanced AI Features

2025/09/09
Nigeria’s Textile Import Bill Rises By 100.3% To N365.5bn
Business

Manufacturing, Agric Sectors’ Underperformance Weakens Industrialisation

2025/09/09
Customs Recovers N72.4m From Importers At Lagos Seaports
Business

Customs Generate N3.7trn At Apapa Port In 16 Months

2025/09/09
WaterAid, RUWASA Seek FCT Communities Involvement In WASH
Business

Pepsico, DP World & Wateraid Expand Nigeria’s Wash Programmes

2025/09/09
Raw Materials Council Backs Raw Shea Nut Export Ban
Business

Raw Materials Council Backs Raw Shea Nut Export Ban

2025/09/09
Nestle Nigeria
Business

Nestlé Professional Empowers Food Vendors

2025/09/09
Leadership Conference advertisement

LATEST

IATF 2025: Zamfara Is Open For Investment, Governor Lawal Tells Global Investors

Federal Government, Governors Push Skills Council Bill To NASS

Macron Appoints Sébastien Lecornu As New Prime Minister After Bayrou’s Ouster

Summon: Police Insist On El-Rufai, Others’ Personal Appearance

‘Stopping Natasha From Resumption Unlawful”, Adegboruwa Tells Senate

South Africa Maintain Lead, Share Points With Nigeria In Thrilling World Cup Qualifier

JUST-IN: NUPENG Suspends Strike As Dangote, Union Sign MoU On Workers’ Unionisation

2027: Bayelsa APC Endorses Tinubu For Reelection

PICTORIAL: Late Ajimobi’s Widow Visits Olubadan-designate Oba Ladoja

12 Die, 8 Injured In Imo Road Crash

© 2025 Leadership Media Group - All Rights Reserved.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sport
  • Health
  • Entertainment
  • Opinion
    • Editorial
  • Columns
  • Football
  • Others
    • LeVogue Magazine
    • Conferences
    • National Economy
  • Contact Us

© 2025 Leadership Media Group - All Rights Reserved.